BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3219573

Brooklyn property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 22, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Boiler / HVAC / Service Equipment

BoroughBrooklyn
BIN3219573
Block / Lot07866 / 0057
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039190303K (source ECB number 39190303K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39190303K
ACTIVE
October 22, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. IN BOILER ROOM FIRE BLOCK FOAM USED AND SECTION OF CEILING MISSING OPEN TO FLOOR 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
39190304M
ACTIVE
October 22, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WOODEN ROOF PUT OVER FULL REAR YARD FOR BAR TO USE, COVER IS 20FT X 40FT WITH WOOD SUPPORTS SELF STANDING NOTHING CONNETS TO BUILDING., OBTAIN PERMIT 101 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Boiler / HVAC / Service Equipment; Work Without a Permit. The hearing date is October 22, 2026; the source issue date(s) are May 29, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Boiler / HVAC / Service Equipment — Summons 39190303K

CLASS - 1 · Issued May 29, 2026; hearing October 22, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. IN BOILER ROOM FIRE BLOCK FOAM USED AND SECTION OF CEILING MISSING OPEN TO FLOOR

Cited provision(s): 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

How this type of condition is typically resolved

Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.

Hearing issues to verify

  • Was the cited device in service at the time alleged?
  • Was the equipment already repaired, disconnected or removed?
  • Do required annual inspection / filing records show compliance for the relevant cycle?

Evidence that may matter

  • Licensed contractor maintenance/repair records
  • Inspection and testing results
  • Device-status or annual filing records
  • Utility/CO testing records and photographs where relevant

Work Without a Permit — Summons 39190304M

CLASS - 1 · Issued May 29, 2026; hearing October 22, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WOODEN ROOF PUT OVER FULL REAR YARD FOR BAR TO USE, COVER IS 20FT X 40FT WITH WOOD SUPPORTS SELF STANDING NOTHING CONNETS TO BUILDING., OBTAIN PERMIT

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.