What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Failure to Maintain summonses; Egress / Exit Obstruction. The hearing dates are October 14, 2026, October 21, 2026; the source issue date(s) are August 10, 2026, July 28, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Egress / Exit Obstruction — Summons 39197978K
CLASS - 1 · Issued July 28, 2026; hearing October 14, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. ATOI OBSERVED AT EXP # 2 & # 4 FIRE ESCAPE AT 2ND AND 3 FLOORS A/C UNITS BLOCKED EXIT PASSAGEWAY., REMOVE OBSTRUCTION; REMOVE OBSTRUCTION
Cited provision(s): 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
How this type of condition is typically resolved
Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.
Hearing issues to verify
- Was the cited passageway actually required egress for the affected occupancy?
- Did the alleged obstruction exist when the inspector observed it?
- Was the condition immediately removed and can the timing be documented?
Evidence that may matter
- Dated photographs showing the exit path
- Approved floor/egress plans
- Building or security logs
- Statements or work records documenting removal of stored items/obstructions
Failure to Maintain — Summons 39197979M
CLASS - 2 · Issued July 28, 2026; hearing October 14, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDINGS IN CODE COMPLIANT MANNER: NO BRACKET SUPPORTS FOR A/C WINDOW UNITS, ATOI OBSERVED AT EXP #1 , #2 & #4 IN VARIOUS LOCATIONS NO A/C BRACKETS SUPPORT., REPAIR AND/OR REPLACE; INSTALLE
Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Failure to Maintain — Summons 39199915M
CLASS - 2 · Issued August 10, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI I OBSERVED AT FRONT EXPO.1 AND EXPO.3 THE FIRE ESCAPES HAVE CORROSION AND RUST ACROSS STRUCTURAL MEMBERS . COMPROMISED STEPS TREADS AND PLATFORM. BUIL
Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review