What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 5 Work Without a Permit summonses. The hearing date is October 21, 2026; the source issue date(s) are August 7, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Work Without a Permit — Summons 39199772Y
CLASS - 3 · Issued August 7, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI OBSERVED AT EXP 1 3RD FLOOR LEVEL 2 METAL BRACKETS ATTACHED TO BRICK FACADE WITH BOLTS. AS PER DOB NO PERMIT ON FILE, OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
Cited provision(s): 301 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 39199775J
CLASS - 2 · Issued August 7, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI AS PER DOB FILES PERMIT B01279754-I1-SH ISSUED 07/27/2026 EXP 10/25/2026 IS NOT POSTED ON SITE, POST/PROPERLY POST PERMIT
Cited provision(s): 220 — §28-105.11 FAILURE TO POST PERMIT FOR WORK AT PREMISES
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 39199773X
CLASS - 2 · Issued August 7, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI AS PER DOB FILES PERMITS B00628850-I1-BE ISSUED 10/29/2025 EXP10/06/2026 AND B00654521-I1-EW-SD ISSUED 01/05/2026 EXP10/06/2026 ARE ACTIVE BUT NOT POSTED ON SITE., POST/PROPERLY POST PERMIT
Cited provision(s): 220 — §28-105.11 FAILURE TO POST PERMIT FOR WORK AT PREMISES
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 39199776L
CLASS - 2 · Issued August 7, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI AS PER DOB FILES PERMIT B00654521-I1-EW-SP ISSUED 01/05/2026 EXP 08/31/2026 IS ACTIVE BUT NOT POSTED ON SITE., POST/PROPERLY POST PERMIT
Cited provision(s): 220 — §28-105.11 FAILURE TO POST PERMIT FOR WORK AT PREMISES
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 39199774H
CLASS - 2 · Issued August 7, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI AS PER DOB FILES PERMIT B01280052-I1-EL ISSUED 09/01/2025 EXP 09/13/2026 IS ACTIVE BUT POSTED ON SITE, POST/PROPERLY POST PERMIT
Cited provision(s): 220 — §28-105.11 FAILURE TO POST PERMIT FOR WORK AT PREMISES
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.