Brooklyn property record with 9 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 14, 2026, October 21, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughBrooklyn
BIN3335899
Block / Lot00156 / 7502
October Records9
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557568Y (source ECB number 39557568Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557560J
ACTIVE
October 14, 2026
10:30 AM
CLASS - 1 PENDING $10,000.00 RESPONDING TO AN INCIDENT SCAFFOLD MATERIAL FELL ON WORKER, INVESTIGATION REVEAL THAT WORKERS TOOK PIPE SCAFFOLD FROM THE 9 FLOOR TO THE 1ST FLOOR TO LOADED ON TRUCK, INADEQUATE MATERIALS HANDLING AND STORAGE R 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
39557571P
ACTIVE
October 14, 2026
10:30 AM
CLASS - 1 PENDING $5,000.00 BC3307.4.7 AT THE TIME OF MY INSPECTION, I OBSERVED ON STREET AT EXPOSURE #1 ADJACENT TO SIDEWALK SHED LOTS OF PLYWOOD, SHEETROCK, DUMPSTER COMPACTER TRUCK, DELIVERY TRUCK, THERE WERE NO 4FT SOLID BARRIER FROM 1P7
39557534X
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 RESPONDING TO AN INCIDENT SCAFFOLD MATERIAL FELL ON WORKERS, INVESTIGATION REVEAL THAT WORKERS TOOK PIPE SCAFFOLD FROM THE 9 FLOOR TO 1ST FLOOR TO STOCK UNTO TRUCK, INADEQUATE MATERIALS HANDLING AND STORAGE RES 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
39557568Y
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 BC 3310.4 AT THE TIME OF MY INSPECTION 15 STORY BUILDING, I OBSERVED ACTIVE JOBSITE WITH ALL TRADES, UPON REQUEST FOR SITE SAFETY MANAGER AND SITE SAFETY PLAN NONE WAS PRESENTED OR AT JOBSITE, FAILURE TO PROVID 1P7
39557535H
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 RESPONDING TO AN INCIDENT SCAFFOLD MATERIAL FELL ON WORKERS, INVESTIGATION REVEAL THAT WORKERS TOOK PIPE SCAFFOLD FROM THE 9 FLOOR TO 1ST FLOOR TO STOCK UNTO TRUCK, INADEQUATE MATERIALS HANDLING AND STORAGE RES 1J4 — BC 3301.11.1 AND 2 PERMIT HOLDER FAILED TO ENSURE WORKERS RECEIVE SITE SAFETY ORIENTATION
39557569X
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 BC3307.4.7 AT THE TIME OF MY INSPECTION, I OBSERVED ON STREET AT EXPOSURE #1 ADJACENT TO SIDEWALK SHED LOTS OF PLYWOOD, SHEETROCK, DUMPSTER COMPACTER TRUCK, DELIVERY TRUCK, THERE WERE NO 4FT SOLID BARRIER FROM 1P7
39557570N
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF MY INSPECTION, I OBSERVED ELEVATORS IS IN USED TO TRANSPORT MATERIALS AND WORKERS TO THE 9,10,11 FLOORS, UPON REQUEST FOR TEMPORARY CERTIFICATE TO USED NONE WAS PRESENTED OR POSTED INSIDE OF ELEV 179 — AC 1RCNY-MISC,RS-MISC MISCELLANEOUS VIOLATIONS
39557982J
ACTIVE
October 21, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP# 1 2 3. AT EXP# 2 3 OBSERVED EXCESSIVE MATERIAL STORED ON TOP OF SIDEWALK SHED CONTRARY TO APPROVED PLANS. STOP ALL STORAGE OF MATERIAL AND USE OF S 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39557983L
ACTIVE
October 21, 2026
9:30 AM
CLASS - 2 PENDING $2,400.00 AT TIME OF INSPECTION OBSERVED SIDEWALK SHED NOT MAINTAINED AS PER CODE. OBSERVED SAT EXP# 3 SHED PARAPET PANEL BROKEN / DETACHED. STOP ALL USE OF SIDEWALK SHED DECK MAINTAIN SWS AS PER CODE. 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 9 summons records for this property identifier. The charge mix is: 6 Sidewalk Shed / Scaffold summonses; Site Safety / Safeguarding; Elevator / Vertical Transportation; Work Without a Permit. The hearing dates are October 14, 2026, October 21, 2026; the source issue date(s) are August 16, 2026, August 4, 2026, August 5, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Sidewalk Shed / Scaffold — Summons 39557560J

CLASS - 1 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESPONDING TO AN INCIDENT SCAFFOLD MATERIAL FELL ON WORKER, INVESTIGATION REVEAL THAT WORKERS TOOK PIPE SCAFFOLD FROM THE 9 FLOOR TO THE 1ST FLOOR TO LOADED ON TRUCK, INADEQUATE MATERIALS HANDLING AND STORAGE R

Cited provision(s): 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39557571P

CLASS - 1 · Issued August 5, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC3307.4.7 AT THE TIME OF MY INSPECTION, I OBSERVED ON STREET AT EXPOSURE #1 ADJACENT TO SIDEWALK SHED LOTS OF PLYWOOD, SHEETROCK, DUMPSTER COMPACTER TRUCK, DELIVERY TRUCK, THERE WERE NO 4FT SOLID BARRIER FROM

Cited provision(s): 1P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39557534X

CLASS - 1 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESPONDING TO AN INCIDENT SCAFFOLD MATERIAL FELL ON WORKERS, INVESTIGATION REVEAL THAT WORKERS TOOK PIPE SCAFFOLD FROM THE 9 FLOOR TO 1ST FLOOR TO STOCK UNTO TRUCK, INADEQUATE MATERIALS HANDLING AND STORAGE RES

Cited provision(s): 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Site Safety / Safeguarding — Summons 39557568Y

CLASS - 1 · Issued August 5, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC 3310.4 AT THE TIME OF MY INSPECTION 15 STORY BUILDING, I OBSERVED ACTIVE JOBSITE WITH ALL TRADES, UPON REQUEST FOR SITE SAFETY MANAGER AND SITE SAFETY PLAN NONE WAS PRESENTED OR AT JOBSITE, FAILURE TO PROVID

Cited provision(s): 1P7

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Sidewalk Shed / Scaffold — Summons 39557535H

CLASS - 1 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESPONDING TO AN INCIDENT SCAFFOLD MATERIAL FELL ON WORKERS, INVESTIGATION REVEAL THAT WORKERS TOOK PIPE SCAFFOLD FROM THE 9 FLOOR TO 1ST FLOOR TO STOCK UNTO TRUCK, INADEQUATE MATERIALS HANDLING AND STORAGE RES

Cited provision(s): 1J4 — BC 3301.11.1 AND 2 PERMIT HOLDER FAILED TO ENSURE WORKERS RECEIVE SITE SAFETY ORIENTATION

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39557569X

CLASS - 1 · Issued August 5, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC3307.4.7 AT THE TIME OF MY INSPECTION, I OBSERVED ON STREET AT EXPOSURE #1 ADJACENT TO SIDEWALK SHED LOTS OF PLYWOOD, SHEETROCK, DUMPSTER COMPACTER TRUCK, DELIVERY TRUCK, THERE WERE NO 4FT SOLID BARRIER FROM

Cited provision(s): 1P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Elevator / Vertical Transportation — Summons 39557570N

CLASS - 1 · Issued August 5, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION, I OBSERVED ELEVATORS IS IN USED TO TRANSPORT MATERIALS AND WORKERS TO THE 9,10,11 FLOORS, UPON REQUEST FOR TEMPORARY CERTIFICATE TO USED NONE WAS PRESENTED OR POSTED INSIDE OF ELEV

Cited provision(s): 179 — AC 1RCNY-MISC,RS-MISC MISCELLANEOUS VIOLATIONS

How this type of condition is typically resolved

Elevator charges often require licensed-elevator maintenance or repair, the required periodic inspection/test filing, an affirmation of correction where applicable, and reinspection for hazardous conditions.

Hearing issues to verify

  • Does the device number/location on the summons match the building's elevator record?
  • Was the cited defect repaired or the device removed from service before the inspection?
  • Were the required CAT/periodic inspection filings timely and accepted?

Evidence that may matter

  • Elevator device record and inspection/test reports
  • Maintenance contractor logs and repair tickets
  • Affirmation of Correction / reinspection result
  • Photographs or controller/service records

Work Without a Permit — Summons 39557982J

CLASS - 2 · Issued August 16, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP# 1 2 3. AT EXP# 2 3 OBSERVED EXCESSIVE MATERIAL STORED ON TOP OF SIDEWALK SHED CONTRARY TO APPROVED PLANS. STOP ALL STORAGE OF MATERIAL AND USE OF S

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39557983L

CLASS - 2 · Issued August 16, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED SIDEWALK SHED NOT MAINTAINED AS PER CODE. OBSERVED SAT EXP# 3 SHED PARAPET PANEL BROKEN / DETACHED. STOP ALL USE OF SIDEWALK SHED DECK MAINTAIN SWS AS PER CODE.

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 9 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.