Brooklyn property record with 7 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 21, 2026, October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3345834
Block / Lot02005 / 0190
October Records7
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035727760H (source ECB number 35727760H). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35727759K
ACTIVE
October 21, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 PERMANENT DWELLING CONVERTED/USED FOR OTHER THAN PERMANENT RESIDENTIALPURPOSES. DEPARTMENT OF BUILDINGS RECORDS INDICATE BUILDING TO BE LEGALLY APPROVED AS A CLASS 'A' MULTIPLE DWELLING. NOW AT 1ST FLOOR APARTM 2F3 — BC 28-210.3 PERM.DWELLING OFFERED/USED/CONV TO OTHER THAN PERM.RESIDENTIAL PURPOSE
35727760H
ACTIVE
October 21, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. FAILURE TO PROVIDE A SYSTEM OF AUTOMATIC SPRINKLERS WHERE REQUIRED AS PER BC 903.2 AND 27-954 FOR TRANSIENT USE AT 1ST FLOOR APARTMENT. REMEDY: DISCONTIN 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
35729508P
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OCCUPANCY CONTRARY TO THAT ALLOWED BY DEPARTMENT OF BUILDINGS RECORDS.ILLEGAL OCCUPANCY NOTED: AT CELLAR LEVEL HAS BEEN CONVERTED TO AN ADDITIONAL BEDROOM/SLEEPING QUARTERS WITH BED AND OTHER PERSONAL BELONGING 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
35729509R
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR AS PER BC 1008.1(2008 CODE); 27-366; BC 1021.1(2014 CODE); BC 1006.3(2022 CODE); FOR CREATING 189 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR
35729510Y
ACTIVE
October 28, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ELECTRICAL WORK WITHOUT A PERMIT. ILLEGAL WORK NOTED: AT CELLAR LEVEL INSTALLED WIRING(HIGH VOLTAGE) FOR ELECTRICAL DRYER, LIGHTS, SWITCHES AND OUTLETS. REMEDY: OBTAIN PERMIT. 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
35729511X
ACTIVE
October 28, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT A PERMIT. ILLEGAL WORK NOTED: AT CELLAR LEVEL INSTALLED FULL HEIGHT PARTITION WALLS TO CREATE ADDITONAL BEDROOM WITH DOORS AND ENCLOSED FOR 3-PIECE BATHROOM. REMEDY: OBTAIN ALL PERMITS. 201 — 28-105.1 WORK WITHOUT A PERMIT
35729512H
ACTIVE
October 28, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT A PERMIT. ILLEGAL WORK NOTED: AT CELLAR LEVEL INSTALLED WATER AND WASTE LINES TO INSTALLED 3-PIECE BATHROOM(LAVATORY SINK, SHOWER STALL AND WATER CLOSET). REMEDY: OBTAIN PERMIT. 201 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 7 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Other Building / Code Compliance; Failure to Maintain; Illegal Occupancy / Conversion; Egress / Exit Obstruction. The hearing dates are October 21, 2026, October 28, 2026; the source issue date(s) are April 21, 2026, August 24, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 35727759K

CLASS - 2 · Issued April 21, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: PERMANENT DWELLING CONVERTED/USED FOR OTHER THAN PERMANENT RESIDENTIALPURPOSES. DEPARTMENT OF BUILDINGS RECORDS INDICATE BUILDING TO BE LEGALLY APPROVED AS A CLASS 'A' MULTIPLE DWELLING. NOW AT 1ST FLOOR APARTM

Cited provision(s): 2F3 — BC 28-210.3 PERM.DWELLING OFFERED/USED/CONV TO OTHER THAN PERM.RESIDENTIAL PURPOSE

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Failure to Maintain — Summons 35727760H

CLASS - 1 · Issued April 21, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. FAILURE TO PROVIDE A SYSTEM OF AUTOMATIC SPRINKLERS WHERE REQUIRED AS PER BC 903.2 AND 27-954 FOR TRANSIENT USE AT 1ST FLOOR APARTMENT. REMEDY: DISCONTIN

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Illegal Occupancy / Conversion — Summons 35729508P

CLASS - 1 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OCCUPANCY CONTRARY TO THAT ALLOWED BY DEPARTMENT OF BUILDINGS RECORDS.ILLEGAL OCCUPANCY NOTED: AT CELLAR LEVEL HAS BEEN CONVERTED TO AN ADDITIONAL BEDROOM/SLEEPING QUARTERS WITH BED AND OTHER PERSONAL BELONGING

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Egress / Exit Obstruction — Summons 35729509R

CLASS - 1 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR AS PER BC 1008.1(2008 CODE); 27-366; BC 1021.1(2014 CODE); BC 1006.3(2022 CODE); FOR CREATING

Cited provision(s): 189 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Work Without a Permit — Summons 35729510Y

CLASS - 1 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ELECTRICAL WORK WITHOUT A PERMIT. ILLEGAL WORK NOTED: AT CELLAR LEVEL INSTALLED WIRING(HIGH VOLTAGE) FOR ELECTRICAL DRYER, LIGHTS, SWITCHES AND OUTLETS. REMEDY: OBTAIN PERMIT.

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 35729511X

CLASS - 2 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. ILLEGAL WORK NOTED: AT CELLAR LEVEL INSTALLED FULL HEIGHT PARTITION WALLS TO CREATE ADDITONAL BEDROOM WITH DOORS AND ENCLOSED FOR 3-PIECE BATHROOM. REMEDY: OBTAIN ALL PERMITS.

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 35729512H

CLASS - 2 · Issued August 24, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. ILLEGAL WORK NOTED: AT CELLAR LEVEL INSTALLED WATER AND WASTE LINES TO INSTALLED 3-PIECE BATHROOM(LAVATORY SINK, SHOWER STALL AND WATER CLOSET). REMEDY: OBTAIN PERMIT.

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 7 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.