What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Stop Work Order summonses; Other Building / Code Compliance. The hearing date is October 5, 2026; the source issue date(s) are January 2, 2026, January 4, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Stop Work Order — Summons 39172316K
CLASS - 1 · Issued January 4, 2026; hearing October 5, 2026. · Hearing status: PENDING
DOB allegation in the source extract: CONTINUING TO WORK WHILE ON A STOP WORK ORDER. OBSERVED WORKERS ON ROOF OF PREMISES PERFORMING CONSTRUCTION WORK AFTER BEING ISSUED A SWO AND 2 PREVIOUS VIOLATIONS FOR FAILURE TO OBEY SWO. THE WORKERS HAD A LAD
Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Other Building / Code Compliance — Summons 39172317M
CLASS - 1 · Issued January 4, 2026; hearing October 5, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO COMPLY WITH COMMISSIONERS ORDERS. AT TIME OF INSPECTION WHILE ON NOTICE FROM COMMISSIONER THERE WAS WORK STILL GOING ON AT ROOF LEVEL AFTER BEING NOTIFIED ON MULTIPLE OCCASIONS., COMPLY WITH COMMISSI
Cited provision(s): 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Stop Work Order — Summons 39548639H
CLASS - 1 · Issued January 2, 2026; hearing October 5, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION, IT WAS OBSERVED THAT UNLAWFUL WORK WAS COMPLETED AT EXPOSURE NO. 2 OF THE BUILDING WHILE A FULL STOP WORK ORDER ISSUED BY THE COMMISSIONER WAS IN EFFECT UNDER COMPLAINT NO. 3A42792 AN
Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review