BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3422174

Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 7, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Stop Work Order

BoroughBrooklyn
BIN3422174
Block / Lot00845 / 0012
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039556905L (source ECB number 39556905L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39556905L
ACTIVE
October 7, 2026
10:30 AM
CLASS - 1 PENDING $10,000.00 AT TIME OF INSPECTION OBSERVED EXTERIOR WORK AT EXP# 3 4 COMPLETED WHILE UNDER A STOP WORK ORDER. GC FAILED TO COMPLY WITH THE COMMISSIONERS ORDER AND WORKED AGAINST A STOP WORK ORDER ISSUED UNDER REFERENCE COM 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
39556906N
ACTIVE
October 7, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 BC3314.1 AT TIME OF INSPECTION OBSERVED SUPPORTED SCAFFOLD AT INTERIOR 4TH FLOOR NOT MAINTAINED AS PER CODE. SUPPORTED SCAFFOLD NOT FULLY PLANK, PLANK LOSES NOT TIED DOWN. MISSING GUARDRAIL TOE BOARD MID- RAIL 2P7
39556907P
ACTIVE
October 7, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 AT TIME OF INSPECTION OBSERVED 2 SPIRAL STAIRS INSTALLED AT 4TH FLOOR TO 5TH MISSING HANDRAIL ALSO IN ADDITION NO GUARDRAIL TOP LANDING. STOP ALL USE OF SPIRAL STAIRS. 120 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Stop Work Order; Sidewalk Shed / Scaffold; Site Safety / Safeguarding. The hearing date is October 7, 2026; the source issue date(s) are July 22, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Stop Work Order — Summons 39556905L

CLASS - 1 · Issued July 22, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED EXTERIOR WORK AT EXP# 3 4 COMPLETED WHILE UNDER A STOP WORK ORDER. GC FAILED TO COMPLY WITH THE COMMISSIONERS ORDER AND WORKED AGAINST A STOP WORK ORDER ISSUED UNDER REFERENCE COM

Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Sidewalk Shed / Scaffold — Summons 39556906N

CLASS - 2 · Issued July 22, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC3314.1 AT TIME OF INSPECTION OBSERVED SUPPORTED SCAFFOLD AT INTERIOR 4TH FLOOR NOT MAINTAINED AS PER CODE. SUPPORTED SCAFFOLD NOT FULLY PLANK, PLANK LOSES NOT TIED DOWN. MISSING GUARDRAIL TOE BOARD MID- RAIL

Cited provision(s): 2P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Site Safety / Safeguarding — Summons 39556907P

CLASS - 1 · Issued July 22, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED 2 SPIRAL STAIRS INSTALLED AT 4TH FLOOR TO 5TH MISSING HANDRAIL ALSO IN ADDITION NO GUARDRAIL TOP LANDING. STOP ALL USE OF SPIRAL STAIRS.

Cited provision(s): 120 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.