October 2026 NYC DOB / OATH Hearing — BIN 3425801

Brooklyn property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 28, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughBrooklyn
BIN3425801
Block / Lot01756 / 7501
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039200286Y (source ECB number 39200286Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39558148M
ACTIVE
October 28, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED INSTALLED AT EXPO# 4 MISSING PROJECT INFORMATION PANEL CONTRARY TO BC 3301.9.2. CREATING UNSAFE CONDITIONS FOR PUBLIC AND OCCUPIED ADJOINING PROPERTIES, SAFETY MONI 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
39200916J
ACTIVE
October 28, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED WORKERS INSTALLING A SIDEWALK SHED ALONG THE THROOP AVENUE SIDE OF THE BUILDING. NO PERMIT FOUND IN DOB RECORDS FOR THIS WORK. VIOLATION ISSUED., OBTAIN ALL PERMITS 201 — 28-105.1 WORK WITHOUT A PERMIT
39200268K
ACTIVE
October 28, 2026
9:30 AM
CLASS - 2 PENDING $2,400.00 FAILURE TO PROVIDE PEDESTRIAN PROTECTION FOR SIDEWALKS AND WALKWAYS AS REQUIRED. ATOI OBSERVED STRUCTURAL STEEL VERTICAL COLUMN ATTACHED TO PARAPET WALL AND STEEL BEAM DIRECTLY ABOVE PUBLIC SIDEWALK CREATING HA 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
39200286Y
ACTIVE
October 28, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 WORK W/PERMIT: OBSERVED BALCONIES PROTRUDING RIGHT OF WAY AT PUBLIC SIDEWALK MYRTLE AVE,THROOP AVE AND VERNON AVE NOT COMPLY WITH BC3202.2.1.3, JOB 320984208,SIGNED OFF 12/02/2022 PLANS SHOW BALCONIES LENGTH OF 101 — 28-105.1 WORK WITHOUT A PERMIT
39558147K
ACTIVE
October 28, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED INSTALLED AT EXPOSURE# 4 OF PROPERTY THROOP AVENUE SIDE. UPON REVIEW DEPARTMENT RECORD IT APPEAR; SIDEWALK SHED WORK PERMIT HAS NOT YET BEEN ISSUED, CREATING AN UNS 2L7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Sidewalk Shed / Scaffold summonses; 2 Work Without a Permit summonses. The hearing date is October 28, 2026; the source issue date(s) are August 12, 2026, August 18, 2026, August 20, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Sidewalk Shed / Scaffold — Summons 39558148M

CLASS - 2 · Issued August 20, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED INSTALLED AT EXPO# 4 MISSING PROJECT INFORMATION PANEL CONTRARY TO BC 3301.9.2. CREATING UNSAFE CONDITIONS FOR PUBLIC AND OCCUPIED ADJOINING PROPERTIES, SAFETY MONI

Cited provision(s): 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Work Without a Permit — Summons 39200916J

CLASS - 2 · Issued August 18, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED WORKERS INSTALLING A SIDEWALK SHED ALONG THE THROOP AVENUE SIDE OF THE BUILDING. NO PERMIT FOUND IN DOB RECORDS FOR THIS WORK. VIOLATION ISSUED., OBTAIN ALL PERMITS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39200268K

CLASS - 2 · Issued August 12, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE PEDESTRIAN PROTECTION FOR SIDEWALKS AND WALKWAYS AS REQUIRED. ATOI OBSERVED STRUCTURAL STEEL VERTICAL COLUMN ATTACHED TO PARAPET WALL AND STEEL BEAM DIRECTLY ABOVE PUBLIC SIDEWALK CREATING HA

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Work Without a Permit — Summons 39200286Y

CLASS - 1 · Issued August 12, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK W/PERMIT: OBSERVED BALCONIES PROTRUDING RIGHT OF WAY AT PUBLIC SIDEWALK MYRTLE AVE,THROOP AVE AND VERNON AVE NOT COMPLY WITH BC3202.2.1.3, JOB 320984208,SIGNED OFF 12/02/2022 PLANS SHOW BALCONIES LENGTH OF

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39558147K

CLASS - 2 · Issued August 20, 2026; hearing October 28, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED INSTALLED AT EXPOSURE# 4 OF PROPERTY THROOP AVENUE SIDE. UPON REVIEW DEPARTMENT RECORD IT APPEAR; SIDEWALK SHED WORK PERMIT HAS NOT YET BEEN ISSUED, CREATING AN UNS

Cited provision(s): 2L7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.