Site Safety / Safeguarding — Summons 39557483P
DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED: PROPOSED 20 STORY MIXED-USE NB AT FOUNDATION STAGE. ACTIVE JOB SITE. AFTER REVIEWING LOGS, SITE WAS OPEN MULTIPLE DAYS FIXING FENCE. UPON SEARCHING ON SYSTEM SITE SAFETY MANAGER
Cited provision(s): 1P7
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records