What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Site Safety / Safeguarding; Demolition. The hearing date is October 7, 2026; the source issue date(s) are July 29, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Site Safety / Safeguarding — Summons 35729996N
CLASS - 1 · Issued July 29, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO INSTITUTE SAFETY MEASURES/EQUIPMENT OR TEMPORARY CONSTRUCTION-NO GUARDRAILS:-AS NOTED AT THE TIME OF INSPECTION OF A 4 STORY PROPOSED BUILDING; AT 2ND FLOOR LEVEL, I OBSERVED AN UNPROTECTED EXPOSED P
Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Demolition — Summons 35729997P
CLASS - 2 · Issued July 29, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO PROVIDE PROTECTION OF ADJOINING PROPERTY DURING CONSTRUCTION OR DEMOLITION AS REQUIRED-NO WINDOW PROTECTION. AS NOTED: AT TIME OFINSPECTION AT A JOBSITE OF A PROPOSED 4 STORY NEW BUILDING CURRENTLY A
Cited provision(s): 2P5
How this type of condition is typically resolved
Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.
Hearing issues to verify
- Was a demolition permit or required notification in effect before work began?
- Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
- Do contractor and agency records show the required notice was timely?
Evidence that may matter
- Demolition permit and DOB NOW filing history
- Required notification confirmation / timestamp
- Asbestos/environmental documents
- Contractor logs, photographs and demolition sequence records
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.