BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3429244

Brooklyn property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 7, 2026, October 14, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBrooklyn
BIN3429244
Block / Lot02885 / 0001
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557113H (source ECB number 39557113H). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557176P
ACTIVE
October 7, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 AT TIME OF INSPECTION, DURING A DEPARTMENT-ISSUED HIGH WIND ADVISORY, OBSERVED A SUSPENDED SCAFFOLD PLATFORM LANDED ON THE EDGE OF THE SEVENTH-FLOOR BALCONY WITHOUT PROTECTION AND NOT SECURED AS REQUIRED BY THE 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39557113H
ACTIVE
October 7, 2026
8:30 AM
CLASS - 2 PENDING $5,000.00 RESPONDING TO AN INCIDENT, WHERE WORKER ISTVAN BENEDEK RESULTED IN INJURY HIS RIGHT LEG WHEN TESTING MATERIAL HOIST, INSPECTION REVEALED. CONTRACTOR FAILURE TO SAFEGUARD, NO MEANS AND METHODS HOW TO HANDLE MATE 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
39557630X
ACTIVE
October 14, 2026
8:30 AM
CLASS - 2 PENDING $800.00 OBSERVED INSTALLED FIXED MONORAIL MULTIPOINT SUSPENDED SCAFFOLD ON SITE-UPON CHECKING DOB RECORDS-NO NOTIFICATION FOR FIXED/NON ADJUSTABLE SCAFFOLD PROVIDED TO DOB AS REQUIRED(ONLY COUNTERWEIGHTS/ADJUSTABLE SCA 261 — BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO
39557629Z
ACTIVE
October 14, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 MONORAIL SUSPENDED SCAFFOLD SYSTEM INSTALLED CONTRARY TO PLANS-ATTACHMENT OF BEAMS TO CONCRETE SLAB-USING CHOKE/SLING LINES-AS PER PLAN 5/16" WIRE ROPE WITH J-BOLTS AT TOP AND BOTTOM ,TIMBLE,SHACKLE TO BE USED, 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39557631H
ACTIVE
October 14, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 AT THE TIME OF MY INSPECTION -OBSERVED OUTRIGGER BEAM SUSPENDED SCAFFOLD INSTALLED AT EXP#2(ROOF) WITH TIEBACK INSTALLED TO ANGLE ANCHORAGE SYSTEM ON CONCRETE WALL-NO PULL TEST PERFORMED/PROVIDED AS REQUIRED-ST 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses; 2 Sidewalk Shed / Scaffold summonses; Site Safety / Safeguarding. The hearing dates are October 14, 2026, October 7, 2026; the source issue date(s) are July 27, 2026, July 28, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39557176P

CLASS - 2 · Issued July 28, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, DURING A DEPARTMENT-ISSUED HIGH WIND ADVISORY, OBSERVED A SUSPENDED SCAFFOLD PLATFORM LANDED ON THE EDGE OF THE SEVENTH-FLOOR BALCONY WITHOUT PROTECTION AND NOT SECURED AS REQUIRED BY THE

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Site Safety / Safeguarding — Summons 39557113H

CLASS - 2 · Issued July 27, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESPONDING TO AN INCIDENT, WHERE WORKER ISTVAN BENEDEK RESULTED IN INJURY HIS RIGHT LEG WHEN TESTING MATERIAL HOIST, INSPECTION REVEALED. CONTRACTOR FAILURE TO SAFEGUARD, NO MEANS AND METHODS HOW TO HANDLE MATE

Cited provision(s): 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Sidewalk Shed / Scaffold — Summons 39557630X

CLASS - 2 · Issued July 28, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED INSTALLED FIXED MONORAIL MULTIPOINT SUSPENDED SCAFFOLD ON SITE-UPON CHECKING DOB RECORDS-NO NOTIFICATION FOR FIXED/NON ADJUSTABLE SCAFFOLD PROVIDED TO DOB AS REQUIRED(ONLY COUNTERWEIGHTS/ADJUSTABLE SCA

Cited provision(s): 261 — BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Work Without a Permit — Summons 39557629Z

CLASS - 2 · Issued July 28, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: MONORAIL SUSPENDED SCAFFOLD SYSTEM INSTALLED CONTRARY TO PLANS-ATTACHMENT OF BEAMS TO CONCRETE SLAB-USING CHOKE/SLING LINES-AS PER PLAN 5/16" WIRE ROPE WITH J-BOLTS AT TOP AND BOTTOM ,TIMBLE,SHACKLE TO BE USED,

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39557631H

CLASS - 2 · Issued July 28, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION -OBSERVED OUTRIGGER BEAM SUSPENDED SCAFFOLD INSTALLED AT EXP#2(ROOF) WITH TIEBACK INSTALLED TO ANGLE ANCHORAGE SYSTEM ON CONCRETE WALL-NO PULL TEST PERFORMED/PROVIDED AS REQUIRED-ST

Cited provision(s): 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.