We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughBrooklyn
BIN3429276
Block / Lot01717 / 0029
October Records11
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039553907L (source ECB number 39553907L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39553907L
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $1,000.00 UPON INSPECTION OF A ACTIVE 4 STORY NB I OBSERVED A FENCE INSTALLED AT EXPOS 1&4 NOT CONSTRUCTED OR MAINTAINED ACCORDING TO CODE. PROTRUDING NAILS, SCREWS, AND DAMAGED WOOD AT EXPOS 1&4. DAMAGED WOOD PANELS. FE 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
39553908N
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 WITH NOT SIDEWALK SHED PARAPET INFO PANELS INSTALLED AT EXPOS 1&4 CONTRARY TO CODE 3301.9.2 SIDEWALK SHED PARAPET INFORMATION PANEL. I ALSO OBSERVED A FENCE INS 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
39553910M
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 UPON INSPECTION OF AN ACTIVE 4 STORY NB I OBSERVED ROOF PROTECTION INSTALLED ON THE ADJOINING PROPERTY ROOF CONTRARY TO APPROVED DRAWINGS. NO NETTING INSTALLED ON PIPE SCAFFOLD PROTECTION AS PER ROOF PROTECTION 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39553911Y
ACTIVE
October 5, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 UPON INSPECTION OF AN ACTIVE 4 STORY NB I OBSERVED MULTIPLE LOCATIONS ON THE 1ST FLOOR MEZZANINE AND 2ND FLOOR WITH NO TOE BOARDS PROVIDED CONTRARY TO CODE. NO TOE BOARDS IS A OVERHEAD HAZARD WITH NOTHING TO PR 118 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OT TEMPORARY
39553914J
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $2,400.00 UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 NOT MAINTAINED CONTRARY TO CODES 3307.6.5.1 SAFE CONDITION & 3307.6.5.3 RESPONSIBILITY FOR MAINTENANCE AND USE. I OBSERVED MULTIPLE UNPROTECTED 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
39553915L
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 UPON INSPECTION OF AN ACTIVE 4 STORY NB I OBSERVED A FENCE AND SIDEWALK SHED INSTALLED AT EXPOS 4 WITH A PROVIDED PATHWAY BETWEEN THE SHED AND FENCE LESS THAN THE REQUIRED 5FT MINIMUM CONTRARY TO CODE 3307.2.6 2P7
39553916N
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4. UPON REQUEST TO SEE THE FOLLOWING DOCUMENTS TO BE KEPT ON SITE NONE WAS PROVIDED AT THE TIME OF MY INSPECTION (SIDEWALK SHED DAILY INSPECTION L 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39553917P
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 UPON INSPECTION OF AN ACTIVE 4 STORY NB CONSTRUCTION SITE I OBSERVED A TEMP PLATFORM WITH STAIRS INSTALLED ON TOP ON THE 3RD FLOOR. UPON REQUEST TO SEE DESIGN DRAWINGS FOR THE PLATFORM NONE WAS PROVIDED AT THE 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39553920X
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $2,400.00 I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 CONTRARY TO CODE. MULTIPLE BEAMS PLACED WITHIN 18 INCHES FROM THE FACE OF THE CURB LINE CONTRARY TO CODE 3307.6.4.4, INADEQUATE METAL COVERAGE UNDER DECK AT EXP 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
39553921H
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 CONTRARY TO THE APPROVED DRAWINGS. IN CORRECT CROSS BRACE SEQUENCE. VERTICAL MEMBERS INSTALLED WITHIN 18 INCHES FROM THE CURB LINE. 14FT ELEVATI 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39553922J
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $5,000.00 UPON INSPECTION OF A 4 STORY NB I OBSERVED A TOTAL OF 9 UNSAFE AND HAZARDOUS CONDITIONS THAT CAN RESULT IN PEDESTRIAN AND WORKER INJURIES AS WELL AS POSSIBLE PROPERTY DAMAGE THAT HAVE GONE UNADDRESSED. ONLY 1 H 2G5 — BC 3301.13.7 THROUGH BC 3301.13.13 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 11 summons records for this property identifier. The charge mix is: 6 Sidewalk Shed / Scaffold summonses; 2 Work Without a Permit summonses; 2 Site Safety / Safeguarding summonses; Other Building / Code Compliance. The hearing date is October 5, 2026; the source issue date(s) are May 8, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Sidewalk Shed / Scaffold — Summons 39553907L

CLASS - 2 · Issued May 8, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION OF A ACTIVE 4 STORY NB I OBSERVED A FENCE INSTALLED AT EXPOS 1&4 NOT CONSTRUCTED OR MAINTAINED ACCORDING TO CODE. PROTRUDING NAILS, SCREWS, AND DAMAGED WOOD AT EXPOS 1&4. DAMAGED WOOD PANELS. FE

Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39553908N

CLASS - 2 · Issued May 8, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 WITH NOT SIDEWALK SHED PARAPET INFO PANELS INSTALLED AT EXPOS 1&4 CONTRARY TO CODE 3301.9.2 SIDEWALK SHED PARAPET INFORMATION PANEL. I ALSO OBSERVED A FENCE INS

Cited provision(s): 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Work Without a Permit — Summons 39553910M

CLASS - 2 · Issued May 8, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION OF AN ACTIVE 4 STORY NB I OBSERVED ROOF PROTECTION INSTALLED ON THE ADJOINING PROPERTY ROOF CONTRARY TO APPROVED DRAWINGS. NO NETTING INSTALLED ON PIPE SCAFFOLD PROTECTION AS PER ROOF PROTECTION

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Site Safety / Safeguarding — Summons 39553911Y

CLASS - 1 · Issued May 8, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION OF AN ACTIVE 4 STORY NB I OBSERVED MULTIPLE LOCATIONS ON THE 1ST FLOOR MEZZANINE AND 2ND FLOOR WITH NO TOE BOARDS PROVIDED CONTRARY TO CODE. NO TOE BOARDS IS A OVERHEAD HAZARD WITH NOTHING TO PR

Cited provision(s): 118 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OT TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Sidewalk Shed / Scaffold — Summons 39553914J

CLASS - 2 · Issued May 8, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 NOT MAINTAINED CONTRARY TO CODES 3307.6.5.1 SAFE CONDITION & 3307.6.5.3 RESPONSIBILITY FOR MAINTENANCE AND USE. I OBSERVED MULTIPLE UNPROTECTED

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39553915L

CLASS - 2 · Issued May 8, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION OF AN ACTIVE 4 STORY NB I OBSERVED A FENCE AND SIDEWALK SHED INSTALLED AT EXPOS 4 WITH A PROVIDED PATHWAY BETWEEN THE SHED AND FENCE LESS THAN THE REQUIRED 5FT MINIMUM CONTRARY TO CODE 3307.2.6

Cited provision(s): 2P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39553916N

CLASS - 2 · Issued May 8, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4. UPON REQUEST TO SEE THE FOLLOWING DOCUMENTS TO BE KEPT ON SITE NONE WAS PROVIDED AT THE TIME OF MY INSPECTION (SIDEWALK SHED DAILY INSPECTION L

Cited provision(s): 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Site Safety / Safeguarding — Summons 39553917P

CLASS - 2 · Issued May 8, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION OF AN ACTIVE 4 STORY NB CONSTRUCTION SITE I OBSERVED A TEMP PLATFORM WITH STAIRS INSTALLED ON TOP ON THE 3RD FLOOR. UPON REQUEST TO SEE DESIGN DRAWINGS FOR THE PLATFORM NONE WAS PROVIDED AT THE

Cited provision(s): 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Sidewalk Shed / Scaffold — Summons 39553920X

CLASS - 2 · Issued May 8, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 CONTRARY TO CODE. MULTIPLE BEAMS PLACED WITHIN 18 INCHES FROM THE FACE OF THE CURB LINE CONTRARY TO CODE 3307.6.4.4, INADEQUATE METAL COVERAGE UNDER DECK AT EXP

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Work Without a Permit — Summons 39553921H

CLASS - 2 · Issued May 8, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 CONTRARY TO THE APPROVED DRAWINGS. IN CORRECT CROSS BRACE SEQUENCE. VERTICAL MEMBERS INSTALLED WITHIN 18 INCHES FROM THE CURB LINE. 14FT ELEVATI

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Other Building / Code Compliance — Summons 39553922J

CLASS - 2 · Issued May 8, 2026; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UPON INSPECTION OF A 4 STORY NB I OBSERVED A TOTAL OF 9 UNSAFE AND HAZARDOUS CONDITIONS THAT CAN RESULT IN PEDESTRIAN AND WORKER INJURIES AS WELL AS POSSIBLE PROPERTY DAMAGE THAT HAVE GONE UNADDRESSED. ONLY 1 H

Cited provision(s): 2G5 — BC 3301.13.7 THROUGH BC 3301.13.13 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 11 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.