Sidewalk Shed / Scaffold — Summons 39557704J
DOB allegation in the source extract: AT THE TIME OF INSPECTION ON A NON ACTIVE JOB SITE I OBSERVED CONSTRUCTION FENCE AROUND PERIMETER OF SITE COVER WITH EXCESSIVE POSTERS NONE RELATED CONSTRUCTION MATERIAL, VIEWING PANEL NOT COVER WITH PLEXI GLAS
Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records