Brooklyn property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 7, 2026, October 21, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughBrooklyn
BIN3429724
Block / Lot02415 / 0016
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039196895K (source ECB number 39196895K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557245J
ACTIVE
October 7, 2026
10:30 AM
CLASS - 1 PENDING $5,000.00 @7STORY NEW MAJOR BUILDING SITE W/CONSTRUCTION SUPERINTENDENT RAFAEL FERNANDEZ CS#029162 ON JOB RECORD,UPON REVIEW THE SUPER LOG IT WAS REVEALED RAFAEL HAD BEEN PERFORMING DUTY WHILE ON ADDITIONAL JOBS@308 14 S 1P7
39196895K
ACTIVE
October 7, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 THE R-VALUE OF THE INSTALLED EXTERIOR WALLS OUTBOARD INSULATION AT EXPOSURE # 2 AND #4 IS R-VALUE 10 WITH THICKNESS 2" CONTRARY WITH THE APPROVED DOB EN DRAWING AND ARCHITECTURAL DRAWING THAT INDICATE R-VALUE 1 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
35730881L
ACTIVE
October 21, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 FAILURE TO PROVIDE SPECIAL INSPECTION OF CONCRETE PLACEMENT TR1. AS NOTED AT THE TIME OF INSPECTION OF AN ACTIVE JOBSITE, PROPOSED 7 STORY NEW BUILDING, AT 3RD FLOOR LEVEL; I OBSERVED THERE WAS NO TR1 SPECIAL A 285 — §28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. EXHAUST DISCH

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Other Building / Code Compliance; Work Without a Permit; Plumbing / Gas. The hearing dates are October 21, 2026, October 7, 2026; the source issue date(s) are August 13, 2026, July 21, 2026, July 29, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 39557245J

CLASS - 1 · Issued July 29, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: @7STORY NEW MAJOR BUILDING SITE W/CONSTRUCTION SUPERINTENDENT RAFAEL FERNANDEZ CS#029162 ON JOB RECORD,UPON REVIEW THE SUPER LOG IT WAS REVEALED RAFAEL HAD BEEN PERFORMING DUTY WHILE ON ADDITIONAL JOBS@308 14 S

Cited provision(s): 1P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Work Without a Permit — Summons 39196895K

CLASS - 2 · Issued July 21, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: THE R-VALUE OF THE INSTALLED EXTERIOR WALLS OUTBOARD INSULATION AT EXPOSURE # 2 AND #4 IS R-VALUE 10 WITH THICKNESS 2" CONTRARY WITH THE APPROVED DOB EN DRAWING AND ARCHITECTURAL DRAWING THAT INDICATE R-VALUE 1

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Plumbing / Gas — Summons 35730881L

CLASS - 2 · Issued August 13, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE SPECIAL INSPECTION OF CONCRETE PLACEMENT TR1. AS NOTED AT THE TIME OF INSPECTION OF AN ACTIVE JOBSITE, PROPOSED 7 STORY NEW BUILDING, AT 3RD FLOOR LEVEL; I OBSERVED THERE WAS NO TR1 SPECIAL A

Cited provision(s): 285 — §28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. EXHAUST DISCH

How this type of condition is typically resolved

Plumbing/gas matters typically require determining whether the work was permitted and performed by the required licensed trade, correcting unsafe or unapproved conditions, and completing inspections/sign-off.

Hearing issues to verify

  • Was there a valid plumbing/gas filing covering the cited scope?
  • Did the condition predate the respondent's work or ownership?
  • Was the cited installation already disconnected or corrected?

Evidence that may matter

  • Licensed Master Plumber permit / filing records
  • Pressure-test / inspection / utility records
  • Invoices and plumber statements
  • Photographs showing the installation and correction

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.