What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Site Safety / Safeguarding; Failure to Maintain. The hearing date is October 21, 2026; the source issue date(s) are August 12, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Site Safety / Safeguarding — Summons 35729965K
CLASS - 1 · Issued August 12, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIP MEASURES/TEMPORARY CONSTRUCTION "MO HANDRAILS". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL. OBSE
Cited provision(s): 120 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Failure to Maintain — Summons 35729966M
CLASS - 1 · Issued August 12, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN ADEQAUTE HOUSEKEEPING PER SECTION REQUIREMENTS. ASNOTED: AT TIME OF INSPECTION AT A JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL. OBSERBED FROM THE 5TH FLOOR LEVEL OF
Cited provision(s): 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.