October 2026 NYC DOB / OATH Hearing — BIN 3430076

Brooklyn property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 21, 2026, October 30, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughBrooklyn
BIN3430076
Block / Lot00388 / 0019
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557987Z (source ECB number 39557987Z). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557987Z
ACTIVE
October 21, 2026
10:30 AM
CLASS - 1 PENDING $10,000.00 12-STORY NB, ACTIVE FORMWORK/REBAR OPERATIONS WERE OBSERVED ABOVE AN ACTIVE GAS STATION WITHOUT OHP OR A CONTROLLED ACCESS ZONE. A DELIVERY TRUCK AND PERSONNEL WERE DIRECTLY BELOW THE WORK AREA, CREATING A HAZA 1P3
39557990J
ACTIVE
October 21, 2026
10:30 AM
CLASS - 1 PENDING $5,000.00 BC 3307.4.7 12-STORY NB, A CONSTRUCTION MATERIALS STORED ADJACENT TO THE SIDEWALK WITHOUT FENCING AT STORAGE ZONE AT EXP#1, WITH FENCING MISSING 4 FEET SALAD AND MESH ON TOP AND UNRESTRICTED PUBLIC ACCESS. THIS 1P7
39557988K
ACTIVE
October 21, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 12-STORY NB, ACTIVE WORK WAS OBSERVED AT EXP#2 ABOVE AN ACTIVE GAS STATION. THE APPROVED SITE SAFETY PLAN REQUIRES A 20-FT CONTROLLED ACCESS ZONE; NONE WAS IN PLACE. THIS CREATES A HAZARD TO PUBLIC/PROPERTY. ST 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39557989M
ACTIVE
October 21, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 AT INSPECTION OF A PROPOSED 12-STORY BUILDING, ACTIVE CONSTRUCTION WAS OBSERVED WITH MULTIPLE DEBRIS PILES THROUGHOUT THE SITE, CREATING A POTENTIAL FIRE HAZARD AND UNSAFE CONDITION TO PUBLIC AND PROPERTY. STOP 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
35641097N
ACTIVE
October 30, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 BC 1817.6 DEFICIENT DRAWINGS-THE RESPONDENT REGISTERED DESIGN PROFESSIONAL,FALLED TO MEET THE MINIMUM REQUIREMENTS OF BC 1817.6,WHICH MANDATES THAT CONSTRUCTION DOCUMENTS FOR METHODS OF SUPPORT OF ADJACENT BUIL 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 2 Other Building / Code Compliance summonses; Work Without a Permit; Failure to Maintain; Sign / Awning / Advertising. The hearing dates are October 21, 2026, October 30, 2026; the source issue date(s) are August 16, 2026, March 12, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 39557987Z

CLASS - 1 · Issued August 16, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 12-STORY NB, ACTIVE FORMWORK/REBAR OPERATIONS WERE OBSERVED ABOVE AN ACTIVE GAS STATION WITHOUT OHP OR A CONTROLLED ACCESS ZONE. A DELIVERY TRUCK AND PERSONNEL WERE DIRECTLY BELOW THE WORK AREA, CREATING A HAZA

Cited provision(s): 1P3

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Other Building / Code Compliance — Summons 39557990J

CLASS - 1 · Issued August 16, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC 3307.4.7 12-STORY NB, A CONSTRUCTION MATERIALS STORED ADJACENT TO THE SIDEWALK WITHOUT FENCING AT STORAGE ZONE AT EXP#1, WITH FENCING MISSING 4 FEET SALAD AND MESH ON TOP AND UNRESTRICTED PUBLIC ACCESS. THIS

Cited provision(s): 1P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Work Without a Permit — Summons 39557988K

CLASS - 2 · Issued August 16, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 12-STORY NB, ACTIVE WORK WAS OBSERVED AT EXP#2 ABOVE AN ACTIVE GAS STATION. THE APPROVED SITE SAFETY PLAN REQUIRES A 20-FT CONTROLLED ACCESS ZONE; NONE WAS IN PLACE. THIS CREATES A HAZARD TO PUBLIC/PROPERTY. ST

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39557989M

CLASS - 1 · Issued August 16, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT INSPECTION OF A PROPOSED 12-STORY BUILDING, ACTIVE CONSTRUCTION WAS OBSERVED WITH MULTIPLE DEBRIS PILES THROUGHOUT THE SITE, CREATING A POTENTIAL FIRE HAZARD AND UNSAFE CONDITION TO PUBLIC AND PROPERTY. STOP

Cited provision(s): 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Sign / Awning / Advertising — Summons 35641097N

CLASS - 1 · Issued March 12, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC 1817.6 DEFICIENT DRAWINGS-THE RESPONDENT REGISTERED DESIGN PROFESSIONAL,FALLED TO MEET THE MINIMUM REQUIREMENTS OF BC 1817.6,WHICH MANDATES THAT CONSTRUCTION DOCUMENTS FOR METHODS OF SUPPORT OF ADJACENT BUIL

Cited provision(s): 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS

How this type of condition is typically resolved

Sign-related charges usually require confirming zoning/permit requirements, dimensions, illumination and placement, followed by permit/legalization or removal/modification.

Hearing issues to verify

  • Was the sign/awning exempt from a permit or already covered by an approved filing?
  • Were the dimensions/location described by the inspector accurate?
  • Was the sign removed or modified before the summons date or hearing?

Evidence that may matter

  • Sign permit / zoning documents
  • Measured photographs and drawings
  • Removal or modification invoice
  • Prior approvals and storefront plans

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.