Brooklyn property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 14, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughBrooklyn
BIN3430294
Block / Lot02482 / 0009
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557592Y (source ECB number 39557592Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557593X
ACTIVE
October 14, 2026
10:30 AM
CLASS - 1 PENDING $10,000.00 AT TIME OF INSPECTION OBSERVED: FORM WOOD DECK WORK AND REBAR DELIVERY IN PROGRESS AT 9TH FL. LEVEL MISSING ROOF/OHP AT CORNER EXPO# 1-4 CREATING AN UNSAFE HAZARDOUS CONDITION FOR ADJOINING OCCUPIED BUILDING, M 1P3
39557594H
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE DECK FORM WORK/REBAR IN PROGRESS AT 9TH FL. LEVEL 90 FEET APPROX. IN HEIGHT STANDPIPE NOT IN STATE OF READINESS, CONTRARY TO BC 3303.8 CREATING A POTENTIAL FIRE H 1P7
39557592Y
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE 9TH FLOOR WORK/REBAR DELIVERY TO REACH 90 FEET HEIGHT APPROX. IN PROGRESS SUPPORTED SCAFFOLD INSTALLED AS AN ALTERNATIVE AT 7TH FL. CONTRARY TO BC 3308.6.1.4.1 CR 1P7
39557595J
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 AT TIME OF INSPECTION OBSERVED: CRANE OPERATIONS HOISTING MATERIAL AT 9TH FL. INADEQUATE STAGE WORK ZONE EXPO# 1 CONCRETE WASH OUT BOX PROPER ENCLOSURE NO 4' CONTINUES BARRIER AND WIRE SCREEN THE SPACE BETWEEN 1P7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 2 Other Building / Code Compliance summonses; Sidewalk Shed / Scaffold; Crane / Hoist / Derricks. The hearing date is October 14, 2026; the source issue date(s) are August 5, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 39557593X

CLASS - 1 · Issued August 5, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED: FORM WOOD DECK WORK AND REBAR DELIVERY IN PROGRESS AT 9TH FL. LEVEL MISSING ROOF/OHP AT CORNER EXPO# 1-4 CREATING AN UNSAFE HAZARDOUS CONDITION FOR ADJOINING OCCUPIED BUILDING, M

Cited provision(s): 1P3

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Other Building / Code Compliance — Summons 39557594H

CLASS - 1 · Issued August 5, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE DECK FORM WORK/REBAR IN PROGRESS AT 9TH FL. LEVEL 90 FEET APPROX. IN HEIGHT STANDPIPE NOT IN STATE OF READINESS, CONTRARY TO BC 3303.8 CREATING A POTENTIAL FIRE H

Cited provision(s): 1P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Sidewalk Shed / Scaffold — Summons 39557592Y

CLASS - 1 · Issued August 5, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE 9TH FLOOR WORK/REBAR DELIVERY TO REACH 90 FEET HEIGHT APPROX. IN PROGRESS SUPPORTED SCAFFOLD INSTALLED AS AN ALTERNATIVE AT 7TH FL. CONTRARY TO BC 3308.6.1.4.1 CR

Cited provision(s): 1P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Crane / Hoist / Derricks — Summons 39557595J

CLASS - 1 · Issued August 5, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED: CRANE OPERATIONS HOISTING MATERIAL AT 9TH FL. INADEQUATE STAGE WORK ZONE EXPO# 1 CONCRETE WASH OUT BOX PROPER ENCLOSURE NO 4' CONTINUES BARRIER AND WIRE SCREEN THE SPACE BETWEEN

Cited provision(s): 1P7

How this type of condition is typically resolved

Crane/hoist matters are specialized safety and licensing cases. Resolution generally requires the correct equipment permit/notification, licensed operator/equipment records, inspections and compliance with site-specific lifting/safety requirements.

Hearing issues to verify

  • Did the cited equipment and activity require the permit/notification alleged?
  • Was the operator/equipment authorization current on the inspection date?
  • Do logs and inspection records contradict the unsafe condition described?

Evidence that may matter

  • Equipment permit / CD filing
  • Operator license and equipment certification
  • Inspection / maintenance / lift-plan records
  • Dated site photographs and safety logs

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.