October 2026 NYC DOB / OATH Hearing — BIN 3430315

Brooklyn property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 7, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBrooklyn
BIN3430315
Block / Lot03618 / 0001
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039556993K (source ECB number 39556993K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557090Y
ACTIVE
October 7, 2026
10:30 AM
CLASS - 2 PENDING $5,000.00 @ACTIVE FOUNDATION PHASE SITE OBSERVE NEIGHBOR PROPERTY REAR YARD STAIR(569 WATKINS ST)CRACKED/DAMAGED WITH SOIL LOSS ADJACENT TO SITES UNSUPPORTED OVER 7' HIGH EXCAVATION BC3304.4+UNSUPPORTED EXCAVATION ADJACE 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
39557088P
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 @ACTIVE SITE IN FOUNDATION PHASE, I REQUESTED PERSONNEL FOR FOUNDATION PHASE SITE SAFETY PLAN 3301.13.1/28-110.2, SHORING DESIGN DRAWING FOR THE LUMBER+PLYWOOD SUPPORTING APPROX. 17'X17' EXCAVATED MATERIAL THAT 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39556993K
ACTIVE
October 7, 2026
9:30 AM
CLASS - 2 PENDING $2,500.00 BC 3307.4.7 AT TIME OF MY INSPECTION, I OBSERVED WORK AND STORAGE ZONE WITH EXCESSIVE MATERIAL & SECURITY BOOT NOT PROPERLY PROTECTED/ SECURED AT EXPOSURE 1 IN THE ROADWAY WAS NOT PROVIDED WITH A 4 FEET BARRIER 2P7
39557089R
ACTIVE
October 7, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 @ACTIVE SITE IN EXCAVATION/FOUNDATION PHASE OBSERVE OPEN EXCAVATION OVER 7' IN HEIGHT WITH NO SUPPORT OF EXCAVATION IN PLACE UNDERMINING NEIGHBOR PROPERTY(569 WATKINS ST)REAR YARD STAIR,&NEIGHBOR REAR STRUCTURE 110 — BC 3304.4,27-1032 FAIL TO PROVIDE PROTECTION AT SIDES OF EXCAVATION

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 2 Site Safety / Safeguarding summonses; 2 Other Building / Code Compliance summonses. The hearing date is October 7, 2026; the source issue date(s) are July 23, 2026, July 27, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 39557090Y

CLASS - 2 · Issued July 27, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: @ACTIVE FOUNDATION PHASE SITE OBSERVE NEIGHBOR PROPERTY REAR YARD STAIR(569 WATKINS ST)CRACKED/DAMAGED WITH SOIL LOSS ADJACENT TO SITES UNSUPPORTED OVER 7' HIGH EXCAVATION BC3304.4+UNSUPPORTED EXCAVATION ADJACE

Cited provision(s): 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39557088P

CLASS - 1 · Issued July 27, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: @ACTIVE SITE IN FOUNDATION PHASE, I REQUESTED PERSONNEL FOR FOUNDATION PHASE SITE SAFETY PLAN 3301.13.1/28-110.2, SHORING DESIGN DRAWING FOR THE LUMBER+PLYWOOD SUPPORTING APPROX. 17'X17' EXCAVATED MATERIAL THAT

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Other Building / Code Compliance — Summons 39556993K

CLASS - 2 · Issued July 23, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC 3307.4.7 AT TIME OF MY INSPECTION, I OBSERVED WORK AND STORAGE ZONE WITH EXCESSIVE MATERIAL & SECURITY BOOT NOT PROPERLY PROTECTED/ SECURED AT EXPOSURE 1 IN THE ROADWAY WAS NOT PROVIDED WITH A 4 FEET BARRIER

Cited provision(s): 2P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Other Building / Code Compliance — Summons 39557089R

CLASS - 1 · Issued July 27, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: @ACTIVE SITE IN EXCAVATION/FOUNDATION PHASE OBSERVE OPEN EXCAVATION OVER 7' IN HEIGHT WITH NO SUPPORT OF EXCAVATION IN PLACE UNDERMINING NEIGHBOR PROPERTY(569 WATKINS ST)REAR YARD STAIR,&NEIGHBOR REAR STRUCTURE

Cited provision(s): 110 — BC 3304.4,27-1032 FAIL TO PROVIDE PROTECTION AT SIDES OF EXCAVATION

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.