October 2026 NYC DOB / OATH Hearing — BIN 3430602

Brooklyn property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 22, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBrooklyn
BIN3430602
Block / Lot07889 / 0044
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039551261M (source ECB number 39551261M). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39551257J
ACTIVE
October 22, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF MY INSPECTION OF A 1 STORY BUILDING, I OBSERVED LARGE AMOUNT GARBAGE AND DEMOLITION DEBRIS INSIDE OF BUILDING APPROXIMATELY 6 TO 7 FEET IN HEIGHT. FAILURE TO PROVIDE AND MAINTAIN ADEQUATE HOUSEKE 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
39551258L
ACTIVE
October 22, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 AT THE TIME OF MY INSPECTION OF A 1 STORY BUILDING, I OBSERVED ON TOP OF ROOF THAT THERE WERE NO GUARDRAILS AROUND PERIMETER OF THE ROOF. FAILURE TO PROVIDE AND MAINTAIN ADEQUATE GUARDRAILS CREATE A HAZARD FOR 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
39551259N
ACTIVE
October 22, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 BC 3303.9 AT THE TIME OF MY INSPECTION OF A 1 STORY BUILDING, I OBSERVED THAT THERE WERE NO INGRESS OR EGRESS TO ACCESS THE ROOF FAILURE TO PROVIDE AND MAINTAIN ADEQUATE INGRESS OR EGRESS TO ROOF CREATE A HAZAR 1P7
39551260K
ACTIVE
October 22, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 AT THE TIME OF MY INSPECTION OF A 1 STORY BUILDING, I OBSERVED 8 WORKERS ON JOBSITE, UPON REQUEST FOR SITE SAFETY ORIENTATION AND REFRESHER FROM THE COMPETENT PERSON, NONE WAS PRESENTED OR AT JOBSITE. FAILURE T 1J6 — BC 3301.11.4 FAILURE TO COMMUNICATE REQUIRED INFORMATION DURING SITE SAFETY ORIENTA
39551261M
ACTIVE
October 22, 2026
8:30 AM
CLASS - 2 PENDING $5,000.00 AT THE TIME OF MY INSPECTION, RESPONDING TO AN INCIDENT THAT WORKER FELL FROM ROOF. INVESTIGATION REVEAL THAT WORKER WAS STANDING ON ROOF JOIST REMOVING SUB ROOF WHEN THE ROTTEN ROOF JOIST BROKE AND HE FELL TO 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Site Safety / Safeguarding summonses; Demolition; Egress / Exit Obstruction. The hearing date is October 22, 2026; the source issue date(s) are March 4, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Demolition — Summons 39551257J

CLASS - 1 · Issued March 4, 2026; hearing October 22, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OF A 1 STORY BUILDING, I OBSERVED LARGE AMOUNT GARBAGE AND DEMOLITION DEBRIS INSIDE OF BUILDING APPROXIMATELY 6 TO 7 FEET IN HEIGHT. FAILURE TO PROVIDE AND MAINTAIN ADEQUATE HOUSEKE

Cited provision(s): 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS

How this type of condition is typically resolved

Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.

Hearing issues to verify

  • Was a demolition permit or required notification in effect before work began?
  • Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
  • Do contractor and agency records show the required notice was timely?

Evidence that may matter

  • Demolition permit and DOB NOW filing history
  • Required notification confirmation / timestamp
  • Asbestos/environmental documents
  • Contractor logs, photographs and demolition sequence records

Site Safety / Safeguarding — Summons 39551258L

CLASS - 1 · Issued March 4, 2026; hearing October 22, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OF A 1 STORY BUILDING, I OBSERVED ON TOP OF ROOF THAT THERE WERE NO GUARDRAILS AROUND PERIMETER OF THE ROOF. FAILURE TO PROVIDE AND MAINTAIN ADEQUATE GUARDRAILS CREATE A HAZARD FOR

Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Egress / Exit Obstruction — Summons 39551259N

CLASS - 1 · Issued March 4, 2026; hearing October 22, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC 3303.9 AT THE TIME OF MY INSPECTION OF A 1 STORY BUILDING, I OBSERVED THAT THERE WERE NO INGRESS OR EGRESS TO ACCESS THE ROOF FAILURE TO PROVIDE AND MAINTAIN ADEQUATE INGRESS OR EGRESS TO ROOF CREATE A HAZAR

Cited provision(s): 1P7

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Site Safety / Safeguarding — Summons 39551260K

CLASS - 1 · Issued March 4, 2026; hearing October 22, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OF A 1 STORY BUILDING, I OBSERVED 8 WORKERS ON JOBSITE, UPON REQUEST FOR SITE SAFETY ORIENTATION AND REFRESHER FROM THE COMPETENT PERSON, NONE WAS PRESENTED OR AT JOBSITE. FAILURE T

Cited provision(s): 1J6 — BC 3301.11.4 FAILURE TO COMMUNICATE REQUIRED INFORMATION DURING SITE SAFETY ORIENTA

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39551261M

CLASS - 2 · Issued March 4, 2026; hearing October 22, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION, RESPONDING TO AN INCIDENT THAT WORKER FELL FROM ROOF. INVESTIGATION REVEAL THAT WORKER WAS STANDING ON ROOF JOIST REMOVING SUB ROOF WHEN THE ROTTEN ROOF JOIST BROKE AND HE FELL TO

Cited provision(s): 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.