BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3819084

Brooklyn property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 5, 2026, October 23, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBrooklyn
BIN3819084
Block / Lot03511 / 0064
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039548060Z (source ECB number 39548060Z). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39546889L
ACTIVE
October 5, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVATION: AT EXPOSURE#1 TEMPORARY CONSTRUCTION (FENCE) EQUIPMENT EXTENDING 5' UPON MY REVIEW DRAWING SHOW FENCE WITH 3'EXTENTION. VIO FORFENCE CONTRARY TO PLAN. WITHOUT D.O.T PERMIT. CONFORM TO PLAN & PROVID 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39548060Z
ACTIVE
October 23, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 AT THE TIME OF INSPECTION AFTER REVIEWING DOCUMENT THE DISABILITY INSURRANCE SHOWED UP EXPIRED 12/12/2025 GC# 611328 148 — 28-401.9 FAILURE TO FILE EVIDENCE OF COMPLIANCE WITH WORKERS COMP, LAW AND/OR D
39548061K
ACTIVE
October 23, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 LACK OF ACCESS TO SECOND DECK, NO REBA COVERS, NO FALL PROTECTION PROVIDED BY GC #611328 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
39548062M
ACTIVE
October 23, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 NO SITE SAFTEY DRAWING; NOT TOOL BOX TALK; NO ORENTATION; NO PRESHIFT; NO SIDEWALK SHEED CHECKLIST NO COLD FORM STEEL DRAWING; NO STRUCTUAL DRAWING; NO FENCE DRAWING; 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 2 Site Safety / Safeguarding summonses; Work Without a Permit; Crane / Hoist / Derricks. The hearing dates are October 23, 2026, October 5, 2026; the source issue date(s) are December 18, 2025, November 12, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39546889L

CLASS - 2 · Issued November 12, 2025; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVATION: AT EXPOSURE#1 TEMPORARY CONSTRUCTION (FENCE) EQUIPMENT EXTENDING 5' UPON MY REVIEW DRAWING SHOW FENCE WITH 3'EXTENTION. VIO FORFENCE CONTRARY TO PLAN. WITHOUT D.O.T PERMIT. CONFORM TO PLAN & PROVID

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Crane / Hoist / Derricks — Summons 39548060Z

CLASS - 1 · Issued December 18, 2025; hearing October 23, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION AFTER REVIEWING DOCUMENT THE DISABILITY INSURRANCE SHOWED UP EXPIRED 12/12/2025 GC# 611328

Cited provision(s): 148 — 28-401.9 FAILURE TO FILE EVIDENCE OF COMPLIANCE WITH WORKERS COMP, LAW AND/OR D

How this type of condition is typically resolved

Crane/hoist matters are specialized safety and licensing cases. Resolution generally requires the correct equipment permit/notification, licensed operator/equipment records, inspections and compliance with site-specific lifting/safety requirements.

Hearing issues to verify

  • Did the cited equipment and activity require the permit/notification alleged?
  • Was the operator/equipment authorization current on the inspection date?
  • Do logs and inspection records contradict the unsafe condition described?

Evidence that may matter

  • Equipment permit / CD filing
  • Operator license and equipment certification
  • Inspection / maintenance / lift-plan records
  • Dated site photographs and safety logs

Site Safety / Safeguarding — Summons 39548061K

CLASS - 1 · Issued December 18, 2025; hearing October 23, 2026. · Hearing status: PENDING

DOB allegation in the source extract: LACK OF ACCESS TO SECOND DECK, NO REBA COVERS, NO FALL PROTECTION PROVIDED BY GC #611328

Cited provision(s): 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39548062M

CLASS - 1 · Issued December 18, 2025; hearing October 23, 2026. · Hearing status: PENDING

DOB allegation in the source extract: NO SITE SAFTEY DRAWING; NOT TOOL BOX TALK; NO ORENTATION; NO PRESHIFT; NO SIDEWALK SHEED CHECKLIST NO COLD FORM STEEL DRAWING; NO STRUCTUAL DRAWING; NO FENCE DRAWING;

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.