BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3820168

Brooklyn property record with 8 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughBrooklyn
BIN3820168
Block / Lot04684 / 0020
October Records8
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039555618Y (source ECB number 39555618Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39555614R
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $5,000.00 AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #3 AND 4 FOAM PARTICLES ON STREET, AT ADJACENT PROPERTY DRIVEWAY AND ALL OVER THE NEIGHBORHOOD FROM FOAM AND STUCCO OPERATION, AL 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
39555615Z
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 BC 3307.4.7 AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #3 MATERIALS STORED ON STREET ADJACENT TO SIDEWALK SHED AND THERE WERE NO 4 FEET SOLID BARRIER FROM GROUND LEVEL 18 G 1P7
39555616K
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED 3 WORKERS ON PUMPJACK SCAFFOLD AT EXPOSURE #4 INSTALLING STYROFOAM FOR FACADE AND THERE WERE PARTIAL ROOF PROTECTION AT ADJACENT BUILDING. FA 1P4
39555617M
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 BC 3303.4.1.1AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE # 3, SIDEWALK UNDER SIDEWALK SHED HAVE A LOTS OF CRACKS AND HOLES THAT COULD RESULT IN FALL AND TRIP FOR PEDESTRIANS 1P7
39555618Y
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 BC 3397.2.1 AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #3 EAST 59 STREET MATERIALS STORING ON STREET AND YODOCK BARRIERS, UPON REQUEST FOR DOT PERMIT TO STORE MATERIALS ON 1P7
39555626Y
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 BC 3314.4.5.2 AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED 6 WORKERS ON PUMPJACK SCAFFOLD DOING STUCCO WORK, UPON REQUEST FOR THERE CERTIFICATION TO USED SCAFFOLD 1 WORKER SCAFFOLD CARD 2P7
39555627X
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 BC 3314.6.2AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED 6 WORKERS ON PUMPJACK SCAFFOLD INSTALLING STYROFOAM FOR STUCCO OPERATION AT VARIOUS LOCATION, UPON INSPECTION OF THE LIFELINE FOR 1P7
39555837Y
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 AT THE TIME OF INSPECTION OF A 4-STORY NB ACTIVE JOB SITE, STYROFOAM INSULATION WORK WAS OBSERVED AT THE ROOF, BULKHEAD, AND PARAPET WALL DESPITE A STOP WORK ORDER ISSUED ON 06/16/2026 (REF. NO. 3A67116). CONTR 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 8 summons records for this property identifier. The charge mix is: 4 Sidewalk Shed / Scaffold summonses; Site Safety / Safeguarding; Façade / Exterior Wall; Other Building / Code Compliance; Stop Work Order. The hearing date is October 16, 2026; the source issue date(s) are June 16, 2026, June 24, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 39555614R

CLASS - 2 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #3 AND 4 FOAM PARTICLES ON STREET, AT ADJACENT PROPERTY DRIVEWAY AND ALL OVER THE NEIGHBORHOOD FROM FOAM AND STUCCO OPERATION, AL

Cited provision(s): 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Sidewalk Shed / Scaffold — Summons 39555615Z

CLASS - 1 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC 3307.4.7 AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #3 MATERIALS STORED ON STREET ADJACENT TO SIDEWALK SHED AND THERE WERE NO 4 FEET SOLID BARRIER FROM GROUND LEVEL 18 G

Cited provision(s): 1P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Façade / Exterior Wall — Summons 39555616K

CLASS - 1 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED 3 WORKERS ON PUMPJACK SCAFFOLD AT EXPOSURE #4 INSTALLING STYROFOAM FOR FACADE AND THERE WERE PARTIAL ROOF PROTECTION AT ADJACENT BUILDING. FA

Cited provision(s): 1P4

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Sidewalk Shed / Scaffold — Summons 39555617M

CLASS - 1 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC 3303.4.1.1AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE # 3, SIDEWALK UNDER SIDEWALK SHED HAVE A LOTS OF CRACKS AND HOLES THAT COULD RESULT IN FALL AND TRIP FOR PEDESTRIANS

Cited provision(s): 1P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Other Building / Code Compliance — Summons 39555618Y

CLASS - 1 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC 3397.2.1 AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #3 EAST 59 STREET MATERIALS STORING ON STREET AND YODOCK BARRIERS, UPON REQUEST FOR DOT PERMIT TO STORE MATERIALS ON

Cited provision(s): 1P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Sidewalk Shed / Scaffold — Summons 39555626Y

CLASS - 2 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC 3314.4.5.2 AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED 6 WORKERS ON PUMPJACK SCAFFOLD DOING STUCCO WORK, UPON REQUEST FOR THERE CERTIFICATION TO USED SCAFFOLD 1 WORKER SCAFFOLD CARD

Cited provision(s): 2P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39555627X

CLASS - 1 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: BC 3314.6.2AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED 6 WORKERS ON PUMPJACK SCAFFOLD INSTALLING STYROFOAM FOR STUCCO OPERATION AT VARIOUS LOCATION, UPON INSPECTION OF THE LIFELINE FOR

Cited provision(s): 1P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Stop Work Order — Summons 39555837Y

CLASS - 1 · Issued June 24, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION OF A 4-STORY NB ACTIVE JOB SITE, STYROFOAM INSULATION WORK WAS OBSERVED AT THE ROOF, BULKHEAD, AND PARAPET WALL DESPITE A STOP WORK ORDER ISSUED ON 06/16/2026 (REF. NO. 3A67116). CONTR

Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Case-specific next step

For this property, the first paid review should reconcile the 8 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.