What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 8 summons records for this property identifier. The charge mix is: 4 Sidewalk Shed / Scaffold summonses; Site Safety / Safeguarding; Façade / Exterior Wall; Other Building / Code Compliance; Stop Work Order. The hearing date is October 16, 2026; the source issue date(s) are June 16, 2026, June 24, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Site Safety / Safeguarding — Summons 39555614R
CLASS - 2 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #3 AND 4 FOAM PARTICLES ON STREET, AT ADJACENT PROPERTY DRIVEWAY AND ALL OVER THE NEIGHBORHOOD FROM FOAM AND STUCCO OPERATION, AL
Cited provision(s): 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Sidewalk Shed / Scaffold — Summons 39555615Z
CLASS - 1 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BC 3307.4.7 AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #3 MATERIALS STORED ON STREET ADJACENT TO SIDEWALK SHED AND THERE WERE NO 4 FEET SOLID BARRIER FROM GROUND LEVEL 18 G
Cited provision(s): 1P7
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Façade / Exterior Wall — Summons 39555616K
CLASS - 1 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED 3 WORKERS ON PUMPJACK SCAFFOLD AT EXPOSURE #4 INSTALLING STYROFOAM FOR FACADE AND THERE WERE PARTIAL ROOF PROTECTION AT ADJACENT BUILDING. FA
Cited provision(s): 1P4
How this type of condition is typically resolved
Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.
Hearing issues to verify
- Does the inspector's description match the actual exposure, floor and defect?
- Was the condition already repaired or protected before the summons date?
- Was there a current FISP/QEWI filing addressing the same condition?
Evidence that may matter
- QEWI report, FISP filing or amended report
- Close-up and elevation photographs identifying the exact defect
- Repair proposals, invoices and completion records
- Engineer/architect letter and inspection documentation
Sidewalk Shed / Scaffold — Summons 39555617M
CLASS - 1 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BC 3303.4.1.1AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE # 3, SIDEWALK UNDER SIDEWALK SHED HAVE A LOTS OF CRACKS AND HOLES THAT COULD RESULT IN FALL AND TRIP FOR PEDESTRIANS
Cited provision(s): 1P7
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Other Building / Code Compliance — Summons 39555618Y
CLASS - 1 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BC 3397.2.1 AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #3 EAST 59 STREET MATERIALS STORING ON STREET AND YODOCK BARRIERS, UPON REQUEST FOR DOT PERMIT TO STORE MATERIALS ON
Cited provision(s): 1P7
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Sidewalk Shed / Scaffold — Summons 39555626Y
CLASS - 2 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BC 3314.4.5.2 AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED 6 WORKERS ON PUMPJACK SCAFFOLD DOING STUCCO WORK, UPON REQUEST FOR THERE CERTIFICATION TO USED SCAFFOLD 1 WORKER SCAFFOLD CARD
Cited provision(s): 2P7
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Sidewalk Shed / Scaffold — Summons 39555627X
CLASS - 1 · Issued June 16, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BC 3314.6.2AT THE TIME OF MY INSPECTION N OF A 4 STORY NEW BUILDING, I OBSERVED 6 WORKERS ON PUMPJACK SCAFFOLD INSTALLING STYROFOAM FOR STUCCO OPERATION AT VARIOUS LOCATION, UPON INSPECTION OF THE LIFELINE FOR
Cited provision(s): 1P7
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Stop Work Order — Summons 39555837Y
CLASS - 1 · Issued June 24, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION OF A 4-STORY NB ACTIVE JOB SITE, STYROFOAM INSULATION WORK WAS OBSERVED AT THE ROOF, BULKHEAD, AND PARAPET WALL DESPITE A STOP WORK ORDER ISSUED ON 06/16/2026 (REF. NO. 3A67116). CONTR
Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Case-specific next step
For this property, the first paid review should reconcile the 8 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.