What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Other Building / Code Compliance summonses; Construction Fence. The hearing dates are October 16, 2026, October 30, 2026, October 7, 2026; the source issue date(s) are December 9, 2025, July 30, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Construction Fence — Summons 39557328P
CLASS - 2 · Issued July 30, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED CONSTRUCTION FENCE ERECTED ON EXPO 1, 2, 3 & 4. NO FENCE PERMIT POSTED ON SITE. FENCE PERMIT B00763695-L1-FN EXPIRED 07/18/2026.RENEW PERMIT. POST RENEWED PERMIT.
Cited provision(s): 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
How this type of condition is typically resolved
Construction-fence charges generally require bringing the fence, gates, viewing panels, height and site protection into compliance with the approved construction-safety setup and maintaining it for the required duration.
Hearing issues to verify
- Did the fence configuration on the inspection date match the approved/logistics plan?
- Was the cited opening or defect temporary and promptly corrected?
- Was a permit or construction-fence filing active where required?
Evidence that may matter
- Approved construction-fence/site logistics documents
- Dated photographs
- Contractor logs and correction invoice
- Permit/filing record
Other Building / Code Compliance — Summons 39547790X
CLASS - 1 · Issued December 9, 2025; hearing October 16, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: 3304.4.5 PLACING OF SOIL OR FOUNDATION WORK EQUIPMENT AND EXCAVATED MATERIAL. OBSERVED JOBSITE ON EXCAVATION PHASE WITH EXCAVATOR, FORMWORK EQUIPMENT & CONSTRUCTION MATERIALS ON EDGE OF EXCAVATED SOIL WITH NO P
Cited provision(s): 1P7
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Other Building / Code Compliance — Summons 39547791H
CLASS - 2 · Issued December 9, 2025; hearing October 30, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: 3307.1 SCOPE. OBSERVED 6 STORY NB ON EXCAVATION PHASE WITH JERSEY BARRIERS AND VEHICLES BLOCKING PARKING LANES. UPON REVIEW OF DOT PERMITS ON SITE, NO ACTIVE PERMITS FOR THE OCCUPANCY OF ROADWAY AND THE USE JER
Cited provision(s): 2P7
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review