BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 4008432

Queens property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 6, 2026, October 13, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughQueens
BIN4008432
Block / Lot00614 / 0039
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035729999Z (source ECB number 35729999Z). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35729998R
ACTIVE
October 6, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OFA PROPOSED 5 STORY NEW BUILDING WITH EXISTING ELEMENTS TO REMAIN CURRE 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
35729999Z
ACTIVE
October 6, 2026
10:30 AM
CLASS - 2 PENDING $5,000.00 FAILURE TO SAFEGUARD THE PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AS NOTED AT THE TIME OF INSPECTION OF AN ACTIVE SIDE, PROPOSE 5 STORY NEW BUILDING AT EXCAVATION. PHASE 1 OBSERVED SOU EXCAVATIO 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
35730878K
ACTIVE
October 13, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AS NOTED: AT THE TIME OF INSPECTION OF A PROPOSED 5 STORY NEW BUILDING ACTIVE JOBSITE AT EXCAVATION PHASE 2. OBSERVED FOUNDATION CONCRETE GRADE BE 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Work Without a Permit; Site Safety / Safeguarding; Stop Work Order. The hearing dates are October 13, 2026, October 6, 2026; the source issue date(s) are August 6, 2026, July 30, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 35729998R

CLASS - 2 · Issued July 30, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OFA PROPOSED 5 STORY NEW BUILDING WITH EXISTING ELEMENTS TO REMAIN CURRE

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Site Safety / Safeguarding — Summons 35729999Z

CLASS - 2 · Issued July 30, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO SAFEGUARD THE PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AS NOTED AT THE TIME OF INSPECTION OF AN ACTIVE SIDE, PROPOSE 5 STORY NEW BUILDING AT EXCAVATION. PHASE 1 OBSERVED SOU EXCAVATIO

Cited provision(s): 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Stop Work Order — Summons 35730878K

CLASS - 1 · Issued August 6, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AS NOTED: AT THE TIME OF INSPECTION OF A PROPOSED 5 STORY NEW BUILDING ACTIVE JOBSITE AT EXCAVATION PHASE 2. OBSERVED FOUNDATION CONCRETE GRADE BE

Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.