What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 7 summons records for this property identifier. The charge mix is: 3 Stop Work Order summonses; 2 Vacate Order summonses; Work Without a Permit; Failure to Maintain. The hearing dates are October 20, 2026, October 27, 2026; the source issue date(s) are June 4, 2026, May 26, 2026, May 27, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Work Without a Permit — Summons 39191181X
CLASS - 2 · Issued June 4, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED NEW PLUMBING ROUGH-IN OF WASTE LINES(UNDERGROUND) & PEX WAS INSTALLED AT REAR ONE STORY STRUCTURE & REAR YARD. NO PERMIT ON FILE FOR THIS SCOPE OF WORK. STOP ALL PLUMBING WORK & MAKE SITE SAFE., OBTAIN
Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Stop Work Order — Summons 39189913J
CLASS - 1 · Issued May 26, 2026; hearing October 27, 2026. · Hearing status: PENDING
DOB allegation in the source extract: UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. NOTED: AT THE TIME OF INSPECTION OBSERVED AT THE REAR YARD OF EXP# 4 CMU WALL AT 12 COURSES AND AT THE TIME OF THE SWO ON (05/23/26) CMU WALL WAS
Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Failure to Maintain — Summons 39189924P
CLASS - 1 · Issued May 26, 2026; hearing October 27, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN. NOTED: AT THE TIME OF INSPECTION OBSERVED CMU BLOCK WALLS ERECTED TO APPROXIMATELY 8 FT WITHOUT ANY REINFORCEMENT INSTALLED, POTENTIALLY COMPROMISING THE STRUCTURAL STABILITY OF THE WALLS.,
Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Stop Work Order — Summons 39190000N
CLASS - 1 · Issued May 27, 2026; hearing October 27, 2026. · Hearing status: PENDING
DOB allegation in the source extract: TAMPERED WITH REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER: AT THE TIME OF INSPECTION, OBSERVED AT FRONT WINDOW OF PROPERTY, STOP WORK ORDER STICKER PREVIOUSLY POSTED UNDER COMPLAINT #4A36237, APPEARING
Cited provision(s): 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Vacate Order — Summons 39190001P
CLASS - 1 · Issued May 27, 2026; hearing October 27, 2026. · Hearing status: PENDING
DOB allegation in the source extract: REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER: AT THE TIME OF INSPECTION, OBSERVED AT FRONT WINDOW OF PROPERTY, VACATE ORDER STICKER PREVIOUSLY POSTED FOR REAR YARD UNDER COMPLAINT #4A36237, APPEARING DEFACE
Cited provision(s): 1G1 — 28-207.4.4 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER
How this type of condition is typically resolved
Vacate-order matters require confirming the exact areas and occupants covered by the order, correcting the conditions that caused the order, completing any required permits/inspections, and obtaining formal agency authorization before reoccupancy.
Hearing issues to verify
- Does the summons identify the correct premises/area and the same vacate order reflected in agency records?
- Was the area occupied on the cited date, and by whom?
- Had the agency already rescinded or modified the vacate order before the alleged occupancy?
Evidence that may matter
- Vacate Order and rescission/modification documents
- DOB/HPD records showing status and affected areas
- Photographs, access logs, leases or occupancy records
- Professional reports / inspection results documenting correction
Vacate Order — Summons 39190002R
CLASS - 1 · Issued May 27, 2026; hearing October 27, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER PER 28-207.4,: AT THE TIME OF INSPECTION, OBSERVED AT REAR YARD, 1 MALE WORKER ACTIVELY CONSTRUCTING CMU WALL, AGAINST ISSUED VACATE ORDER AT REAR YARD ISSUE
Cited provision(s): 1F9 — 28-207.4 FAILURE TO OBEY A VACATE ORDER
How this type of condition is typically resolved
Vacate-order matters require confirming the exact areas and occupants covered by the order, correcting the conditions that caused the order, completing any required permits/inspections, and obtaining formal agency authorization before reoccupancy.
Hearing issues to verify
- Does the summons identify the correct premises/area and the same vacate order reflected in agency records?
- Was the area occupied on the cited date, and by whom?
- Had the agency already rescinded or modified the vacate order before the alleged occupancy?
Evidence that may matter
- Vacate Order and rescission/modification documents
- DOB/HPD records showing status and affected areas
- Photographs, access logs, leases or occupancy records
- Professional reports / inspection results documenting correction
Stop Work Order — Summons 39190012K
CLASS - 1 · Issued May 27, 2026; hearing October 27, 2026. · Hearing status: PENDING
DOB allegation in the source extract: UNLAWFULLY CONTINUE TO WORK WHILE ON NOTICE OF A STOP WORK ORDER: OBSERVED AT REAR YARD, WORK REPEATEDLY CONTINUING, WITH 1 MALE WORKER CONSTRUCTING CMU WALL, CONTRARY TO SWO ISSUED UNDER COMPLAINT #4A35928 ON
Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Case-specific next step
For this property, the first paid review should reconcile the 7 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.