We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughQueens
BIN4035143
Block / Lot01430 / 0029
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039198443Z (source ECB number 39198443Z). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39198443Z
ACTIVE
October 6, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT A PERMIT. NOTED: AT TIME OF INSPECTION OBSERVED APT # E41 ERECTED FULL HEIGHT PARTITION WALL WITH ENTRY DOORS AT LIVING ROOM & DINING ROOM TO CREATE ADDITIONAL BEDROOMS., OBTAIN PERMIT 101 — 28-105.1 WORK WITHOUT A PERMIT
39198444K
ACTIVE
October 6, 2026
8:30 AM
CLASS - 1 PENDING $12,500.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: AT TIME OF INSPECTION AT APT #E41 OBSERVED BEDROOM DOORS WITH KEY LOCKING DEVICE. 126 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBIT
39198468P
ACTIVE
October 6, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE ON A STOP WORK ORDER. NOTED: UNDER COMPLAIN # 4744089 ISSUED ON 09/13/2018 FOR JOB # 421633209. AT TIME OF INSPECTION OBSERVED AT APT #E31 ALL WORK 100% COMPLETED., COM 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
39198442R
ACTIVE
October 6, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT TIME OF INSPECTION OBSERVED AT APT E41 BEDROOM THAT LEADS TO FIRE ESCAPE (2ND MEANS EGRESS) LOCKING DEVICE WAS INSTALLED PREVENTING OTHER OCCUPANTS TO 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
39198445M
ACTIVE
October 6, 2026
9:30 AM
CLASS - 1 PENDING $12,500.00 OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS. AT TIME OF INSPECTION OBSERVED AT APT #E41 DINNING ROOM & LIVING ROOM CONVERTED INTO BEDROOMS WITH BEDS, PILLOWS, BLANKETS,CLOTHES, PERSONAL ITEMS, ETC, APPROX 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
39200934N
ACTIVE
October 27, 2026
8:30 AM
CLASS - 3 PENDING $250.00 WORK WITHOUT A PERMIT. NOTED: AT TIME OF INSPECTION OBSERVED AT APT E41 LIVING ROOM AREA REMOVED PARTITION WALLS & ENTRY DOOR. NO PERMIT ON FILE., OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION 301 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses; Failure to Maintain; Stop Work Order; Egress / Exit Obstruction; Illegal Occupancy / Conversion. The hearing dates are October 27, 2026, October 6, 2026; the source issue date(s) are August 18, 2026, July 29, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39198443Z

CLASS - 1 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. NOTED: AT TIME OF INSPECTION OBSERVED APT # E41 ERECTED FULL HEIGHT PARTITION WALL WITH ENTRY DOORS AT LIVING ROOM & DINING ROOM TO CREATE ADDITIONAL BEDROOMS., OBTAIN PERMIT

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39198444K

CLASS - 1 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: AT TIME OF INSPECTION AT APT #E41 OBSERVED BEDROOM DOORS WITH KEY LOCKING DEVICE.

Cited provision(s): 126 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBIT

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Stop Work Order — Summons 39198468P

CLASS - 1 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNLAWFULLY CONTINUED WORK WHILE ON NOTICE ON A STOP WORK ORDER. NOTED: UNDER COMPLAIN # 4744089 ISSUED ON 09/13/2018 FOR JOB # 421633209. AT TIME OF INSPECTION OBSERVED AT APT #E31 ALL WORK 100% COMPLETED., COM

Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Egress / Exit Obstruction — Summons 39198442R

CLASS - 1 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT TIME OF INSPECTION OBSERVED AT APT E41 BEDROOM THAT LEADS TO FIRE ESCAPE (2ND MEANS EGRESS) LOCKING DEVICE WAS INSTALLED PREVENTING OTHER OCCUPANTS TO

Cited provision(s): 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Illegal Occupancy / Conversion — Summons 39198445M

CLASS - 1 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS. AT TIME OF INSPECTION OBSERVED AT APT #E41 DINNING ROOM & LIVING ROOM CONVERTED INTO BEDROOMS WITH BEDS, PILLOWS, BLANKETS,CLOTHES, PERSONAL ITEMS, ETC, APPROX

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Work Without a Permit — Summons 39200934N

CLASS - 3 · Issued August 18, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. NOTED: AT TIME OF INSPECTION OBSERVED AT APT E41 LIVING ROOM AREA REMOVED PARTITION WALLS & ENTRY DOOR. NO PERMIT ON FILE., OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION

Cited provision(s): 301 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.