What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Egress / Exit Obstruction; Elevator / Vertical Transportation; Façade / Exterior Wall. The hearing dates are October 13, 2026, October 16, 2026; the source issue date(s) are August 5, 2026, January 6, 2026, January 7, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Egress / Exit Obstruction — Summons 39199338L
CLASS - 1 · Issued August 5, 2026; hearing October 13, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER FOR 39107361Z. OBSERVED AT THE 3RD FLOOR APARTMENT C14 ILLEGAL/PROHIBITED KEY LOCKING DEVICES TO TWO (2) BEDROOMS PREVENTING/OBSTRUCTING FIRE-EGRESS TO SAFE
Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.
Hearing issues to verify
- Was the cited passageway actually required egress for the affected occupancy?
- Did the alleged obstruction exist when the inspector observed it?
- Was the condition immediately removed and can the timing be documented?
Evidence that may matter
- Dated photographs showing the exit path
- Approved floor/egress plans
- Building or security logs
- Statements or work records documenting removal of stored items/obstructions
Elevator / Vertical Transportation — Summons 39172713Y
CLASS - 2 · Issued January 6, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT ROOF LEVEL,AT LEFT SIDE,PARAPET WALL HAS SECTIONS WITH PATCHES OF CEMENT, ELEVATOR MOTOR ROOM MISSING STUCCO FINISH., REPAIR AND/OR REPLACE
Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Elevator charges often require licensed-elevator maintenance or repair, the required periodic inspection/test filing, an affirmation of correction where applicable, and reinspection for hazardous conditions.
Hearing issues to verify
- Does the device number/location on the summons match the building's elevator record?
- Was the cited defect repaired or the device removed from service before the inspection?
- Were the required CAT/periodic inspection filings timely and accepted?
Evidence that may matter
- Elevator device record and inspection/test reports
- Maintenance contractor logs and repair tickets
- Affirmation of Correction / reinspection result
- Photographs or controller/service records
Façade / Exterior Wall — Summons 39172868Z
CLASS - 2 · Issued January 7, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT REAR OF BUILDING, AT LEFT SIDE, STRESS CRACKS APPEAR BETWEEN WINDOWS AT ALL FLOORS OVER REAR COURTYARD, MAINTAIN EXTERIOR BUILDING WALL
Cited provision(s): 204 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
How this type of condition is typically resolved
Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.
Hearing issues to verify
- Does the inspector's description match the actual exposure, floor and defect?
- Was the condition already repaired or protected before the summons date?
- Was there a current FISP/QEWI filing addressing the same condition?
Evidence that may matter
- QEWI report, FISP filing or amended report
- Close-up and elevation photographs identifying the exact defect
- Repair proposals, invoices and completion records
- Engineer/architect letter and inspection documentation
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.