What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Elevator / Vertical Transportation; Certificate of Correction / Commissioner Order. The hearing date is October 27, 2026; the source issue date(s) are August 17, 2026, August 20, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Elevator / Vertical Transportation — Summons 39200819H
CLASS - 2 · Issued August 17, 2026; hearing October 27, 2026. · Hearing status: PENDING
DOB allegation in the source extract: 1.6 EMERGENCY SIGNAL ALARM BELL INOPERATIVE, MISSING SIGNAGE AT LOBBY FLOOR PROVIDE, MISALGNED EMERGENCY STOP SWITCH IN COP STATION ..
Cited provision(s): 251 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
How this type of condition is typically resolved
Elevator charges often require licensed-elevator maintenance or repair, the required periodic inspection/test filing, an affirmation of correction where applicable, and reinspection for hazardous conditions.
Hearing issues to verify
- Does the device number/location on the summons match the building's elevator record?
- Was the cited defect repaired or the device removed from service before the inspection?
- Were the required CAT/periodic inspection filings timely and accepted?
Evidence that may matter
- Elevator device record and inspection/test reports
- Maintenance contractor logs and repair tickets
- Affirmation of Correction / reinspection result
- Photographs or controller/service records
Certificate of Correction / Commissioner Order — Summons 39201273J
CLASS - 2 · Issued August 20, 2026; hearing October 27, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS 35720505Z., FILE A CERTIFICATE OF CORRECTION
Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
How this type of condition is typically resolved
This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.
Hearing issues to verify
- Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
- Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
- Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?
Evidence that may matter
- DOB NOW / AEU Certificate of Correction submission or approval record
- Before-and-after photographs tied to the cited condition
- Permits, inspection results, contractor receipts or professional statements supporting the correction
- Proof of applicable DOB civil-penalty payment or waiver, if required
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review