October 2026 NYC DOB / OATH Hearing — BIN 4109691

Queens property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 27, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughQueens
BIN4109691
Block / Lot04848 / 0059
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039201119L (source ECB number 39201119L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39201119L
ACTIVE
October 27, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED ACTIVE SITE WHERE ALL THE EXISTING ELECTRICAL WIRING WAS COMPLETELY REMOVED PLUS EXISTING METER & PANEL WAS TEMPORARY RE-LOCATED TO RIGHT SIDE CONST. FENCE. NO ELECTRICAL PERMIT ON FILE FOR THIS SCOPE 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39201120Z
ACTIVE
October 27, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED SECTION OF THE EXISTING FOUNDATION WALL AT FRONT MIDDLE AREA WAS COMPLETELY REMOVED CONTRARY TO THE APPROVED PLANS-Q01317649-S1. FO-002.00 PG 2 OF 3. PROVIDED ON SITE WHICH SHOWS THIS SECTION TO REMAIN 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39201121K
ACTIVE
October 27, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED ACTIVE SITE WHERE ALL THE EXISTING PLUMBING LINES & FIXTURES WAS COMPLETELY REMOVED WITH A PERMIT. APP. # Q01317649-S3-PL IS ONLY APPROVED & NOT PERMITTED AS OF 1:30PM 08-19-26. STOP ALL PLUMBING WORK. 201 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses. The hearing date is October 27, 2026; the source issue date(s) are August 19, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39201119L

CLASS - 2 · Issued August 19, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED ACTIVE SITE WHERE ALL THE EXISTING ELECTRICAL WIRING WAS COMPLETELY REMOVED PLUS EXISTING METER & PANEL WAS TEMPORARY RE-LOCATED TO RIGHT SIDE CONST. FENCE. NO ELECTRICAL PERMIT ON FILE FOR THIS SCOPE

Cited provision(s): 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39201120Z

CLASS - 2 · Issued August 19, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED SECTION OF THE EXISTING FOUNDATION WALL AT FRONT MIDDLE AREA WAS COMPLETELY REMOVED CONTRARY TO THE APPROVED PLANS-Q01317649-S1. FO-002.00 PG 2 OF 3. PROVIDED ON SITE WHICH SHOWS THIS SECTION TO REMAIN

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39201121K

CLASS - 2 · Issued August 19, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED ACTIVE SITE WHERE ALL THE EXISTING PLUMBING LINES & FIXTURES WAS COMPLETELY REMOVED WITH A PERMIT. APP. # Q01317649-S3-PL IS ONLY APPROVED & NOT PERMITTED AS OF 1:30PM 08-19-26. STOP ALL PLUMBING WORK.

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.