What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Façade / Exterior Wall; Boiler / HVAC / Service Equipment. The hearing dates are October 20, 2026, October 27, 2026; the source issue date(s) are August 10, 2026, August 20, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Façade / Exterior Wall — Summons 35730905R
CLASS - 1 · Issued August 10, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 NORTH (1)CRACKED/SPALLING BRICK AT PARAPET LEVEL MULTI LOC. (2)CRACKED/SPALLING DECORATIVE STONE MASONR
Cited provision(s): 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
How this type of condition is typically resolved
Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.
Hearing issues to verify
- Does the inspector's description match the actual exposure, floor and defect?
- Was the condition already repaired or protected before the summons date?
- Was there a current FISP/QEWI filing addressing the same condition?
Evidence that may matter
- QEWI report, FISP filing or amended report
- Close-up and elevation photographs identifying the exact defect
- Repair proposals, invoices and completion records
- Engineer/architect letter and inspection documentation
Boiler / HVAC / Service Equipment — Summons 39201204X
CLASS - 2 · Issued August 20, 2026; hearing October 27, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED A ROCKMILLS MP 200 BOILER SERIAL #4537, MISSING BELT GUARD AT COMPRESSOR STATION, STORAGE AND DEBRIS THROUGHOUT BOILER ROOM, BURNER SMOKES IN LOW FIRE POSITION NEEDS SERVICE, SLIGHT OIL LEAK AT METERIN
Cited provision(s): 254 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
How this type of condition is typically resolved
Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.
Hearing issues to verify
- Was the cited device in service at the time alleged?
- Was the equipment already repaired, disconnected or removed?
- Do required annual inspection / filing records show compliance for the relevant cycle?
Evidence that may matter
- Licensed contractor maintenance/repair records
- Inspection and testing results
- Device-status or annual filing records
- Utility/CO testing records and photographs where relevant
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review