What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses; 2 Site Safety / Safeguarding summonses; Other Building / Code Compliance; Electrical Work / Electrical Permit. The hearing date is October 6, 2026; the source issue date(s) are July 29, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Work Without a Permit — Summons 39198287X
CLASS - 1 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED ACTIVE SITE WITH WORKERS WORKING AND THE EXISTING PLUMBING LINES CONSISTING OF GAS, WATER & WASTE WERE REMOVED AT VARIOUS LOCATION OF THE BUILDING & NO PLUMBING PERMIT ON FILE AS OF 07-29-26 1:00 PM. A
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Other Building / Code Compliance — Summons 39198290R
CLASS - 1 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED ACTIVE SITE WITH WORKERS WORKING & NO VISIBLE FIRE EXTINGUISHERS ON ANY FLOORS PLUS HOLE OPENINGS LARGER THE 2 INCH AT 2ND & 3RD FLOOR (3303.4). STOP ALL WORK & MAKE SITE SAFE.; 3303.7.2, COMPLY WITH C
Cited provision(s): 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Site Safety / Safeguarding — Summons 39198285M
CLASS - 1 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED ACTIVE SITE WITH MISSING GUARD RAILS AROUND WINDOW & DOOR OPENING WITH WORKERS WORKING. NO OTHER SAFETY MEASURE IN PLACE. STOP ALL WORK & MAKE SITE SAFE., PROVIDE GUARD RAILS; CONTACT OBMSWO@BUILDINGS.
Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Electrical Work / Electrical Permit — Summons 39198288H
CLASS - 2 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED EXISTING ELECTRICAL PANEL BOX AT 1ST FLOOR AREA IS OPEN, UNPROTECTED WITH LOOSE & HANGING WIRES. ACTIVE SITE WITH WORKERS WORKING., COMPLY WITH EC
Cited provision(s): 2C9 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
How this type of condition is typically resolved
Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.
Hearing issues to verify
- Was there an active electrical application/permit covering the cited wiring or equipment?
- Was the condition already corrected or disconnected before the inspection date?
- Does the cited equipment/location match the permitted scope and electrical inspection record?
Evidence that may matter
- Electrical permit/application and inspection records
- Licensed electrician invoice, letter or work order
- Photographs of wiring/equipment before and after correction
- Testing, certification or utility documentation where relevant
Work Without a Permit — Summons 39198286Y
CLASS - 1 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED NEW FOUNDATION & STRUCTURAL WORK WAS DONE FOR ENLARGEMENT OF EXISTING BUILDING & NO STRUCTURAL & FOUNDATION PERMIT ON FILE AS OF 07-29-26 1:00PM. APP. # Q01226162(ST/FO) IS UNDER PLAN EXAMINER REVIEW.
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Site Safety / Safeguarding — Summons 39198289J
CLASS - 1 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED ACTIVE SITE WITH WORKERS WORKING & MISSING RE-BAR CAPS AT VARIOUS LOCATION OF SITE. STOP ALL WORK & MAKE SITE SAFE.; 3301.2, COMPLY WITH CODE; CONTACT [email protected] 212-393-2930 FOR RE-INSPE
Cited provision(s): 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Case-specific next step
For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.