October 2026 NYC DOB / OATH Hearing — BIN 4155094

Queens property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 6, 2026, October 13, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Stop Work Order

BoroughQueens
BIN4155094
Block / Lot07206 / 0034
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039198637R (source ECB number 39198637R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39198636P
ACTIVE
October 6, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT EXPOSURE 3 OF COMMERCIAL SPACE, OBSERVED AN EXTERIOR WALL APPROX 119' L X 5' T MADE OUT OF CINDERBLOCKS AND # 4 REBAR. THE REBAR STICKING APPROX 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39198637R
ACTIVE
October 6, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT A PERMIT. NOTED: AT EXPOSURE 3 OF COMMERCIAL SPACE OBSERVED A STRUCTURAL EXTERIOR WALL APPROX 119' L WALL BY 5' T WALL MADE OUT OF CINDERBLOCKS AND # 4 REBAR. NO PERMITS OBSERVED FOR THIS SCOPE OF 101 — 28-105.1 WORK WITHOUT A PERMIT
39199120Z
ACTIVE
October 13, 2026
10:30 AM
CLASS - 1 PENDING $5,000.00 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER. NOTED: OBSERVED PSWO REMOVED AT EXPOSURE 1., COMPLY WITH CODE 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER
39199112Z
ACTIVE
October 13, 2026
9:30 AM
CLASS - 1 PENDING $10,000.00 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. NOTED: OBSERVED BOBCAT LOADER ON TOP OF OVERTURNED SOIL AND SCATTERED MASONRY DEBRIS, ADJACENT TO A NEIGHBORING FENCE. ALSO ERECTING A NEW WALL MA 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 2 Stop Work Order summonses; Façade / Exterior Wall; Work Without a Permit. The hearing dates are October 13, 2026, October 6, 2026; the source issue date(s) are August 4, 2026, July 31, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Façade / Exterior Wall — Summons 39198636P

CLASS - 1 · Issued July 31, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT EXPOSURE 3 OF COMMERCIAL SPACE, OBSERVED AN EXTERIOR WALL APPROX 119' L X 5' T MADE OUT OF CINDERBLOCKS AND # 4 REBAR. THE REBAR STICKING APPROX

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Work Without a Permit — Summons 39198637R

CLASS - 1 · Issued July 31, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. NOTED: AT EXPOSURE 3 OF COMMERCIAL SPACE OBSERVED A STRUCTURAL EXTERIOR WALL APPROX 119' L WALL BY 5' T WALL MADE OUT OF CINDERBLOCKS AND # 4 REBAR. NO PERMITS OBSERVED FOR THIS SCOPE OF

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Stop Work Order — Summons 39199120Z

CLASS - 1 · Issued August 4, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER. NOTED: OBSERVED PSWO REMOVED AT EXPOSURE 1., COMPLY WITH CODE

Cited provision(s): 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Stop Work Order — Summons 39199112Z

CLASS - 1 · Issued August 4, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. NOTED: OBSERVED BOBCAT LOADER ON TOP OF OVERTURNED SOIL AND SCATTERED MASONRY DEBRIS, ADJACENT TO A NEIGHBORING FENCE. ALSO ERECTING A NEW WALL MA

Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.