What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Plumbing / Gas; Construction Fence; Sidewalk Shed / Scaffold. The hearing dates are October 26, 2026, October 27, 2026; the source issue date(s) are August 21, 2026, March 15, 2024.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Plumbing / Gas — Summons 39108952P
CLASS - 1 · Issued March 15, 2024; hearing October 26, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI, FAILURE TO HAVE ALTERED PLUMBING SYSTEM TESTED AFTER INTERIOR GAS PIPE REMOVAL AND ALTERATION. THIS POSES AN IMMEDIATE HAZARD OF INJURY TO PEOPLE AND PROPERTY DAMAGE BECAUSE GAS PIPING HAS BEEN CHANGED AN
Cited provision(s): 158 — 27-921(A), PC 107.3 (2008 CODE) & PC 107.4 (2014 CODE) FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED.
How this type of condition is typically resolved
Plumbing/gas matters typically require determining whether the work was permitted and performed by the required licensed trade, correcting unsafe or unapproved conditions, and completing inspections/sign-off.
Hearing issues to verify
- Was there a valid plumbing/gas filing covering the cited scope?
- Did the condition predate the respondent's work or ownership?
- Was the cited installation already disconnected or corrected?
Evidence that may matter
- Licensed Master Plumber permit / filing records
- Pressure-test / inspection / utility records
- Invoices and plumber statements
- Photographs showing the installation and correction
Construction Fence — Summons 39201378X
CLASS - 2 · Issued August 21, 2026; hearing October 27, 2026. · Hearing status: PENDING
DOB allegation in the source extract: TEMPORARY CONSTRUCTION EQUIPMENT OR INSTALLATION ON SITE - EXPIRED PERMIT. AT TIME OF INSPECTION, OBSERVED NO ACTIVE CONSTRUCTION FENCE PERMIT. NOTED PERMIT # Q00863273-I1-FN EXPIRED ON 08/29/2024, RENEW PERMIT
Cited provision(s): 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
How this type of condition is typically resolved
Construction-fence charges generally require bringing the fence, gates, viewing panels, height and site protection into compliance with the approved construction-safety setup and maintaining it for the required duration.
Hearing issues to verify
- Did the fence configuration on the inspection date match the approved/logistics plan?
- Was the cited opening or defect temporary and promptly corrected?
- Was a permit or construction-fence filing active where required?
Evidence that may matter
- Approved construction-fence/site logistics documents
- Dated photographs
- Contractor logs and correction invoice
- Permit/filing record
Sidewalk Shed / Scaffold — Summons 39201389L
CLASS - 2 · Issued August 21, 2026; hearing October 27, 2026. · Hearing status: PENDING
DOB allegation in the source extract: JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION. AT TIME OF INSPECTION, OBSERVED NO ACTIVE CONSTRUCTION SITE AND AT THE CORNER OF EXP 1 AND 4 THE FENCE IS LEANING INTO THE SITE. THERE IS ALS
Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.