BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 4192169

Queens property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 6, 2026, October 20, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughQueens
BIN4192169
Block / Lot09204 / 0039
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039186744Y (source ECB number 39186744Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39186744Y
ACTIVE
October 6, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 FAILURE OF PERMIT HOLDER TO PROVIDE INSPECTION ACCESS TO &/OR EXPOSE ONGOING CONSTRUCTION OR WORK ON AN ACTIVE & PERMITTED WORKSITE.UPON INSPECTION OBSERVED WORKER PAINTING ENTRANCE&WORKER MOVING SAND AT EXP1. 2A7 — 28-116.1 PERMIT HOLDER FAIL TO PROVIDE ACCESS AND/OR EXPOSE WORK ON ACTIVE SITE
39199896X
ACTIVE
October 20, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. THE BOILER ROOM IS NOT PROPERLY ENCLOSED IN THE CELLAR LEVEL WITH A FIRE-RATED DOOR OR FRESH AIR INTAKE. THE CELLAR HAS ONLY ONE MEANS OF EGRESS., REPAIR 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39199899L
ACTIVE
October 20, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT PLUMBING PERMIT NOTED; INSTALLED WATER AND WASTE LINE FOR 3PC BATHROOM, RESIDENTIAL SINK, AND ILLEGAL GAS LINE FOR GAS STOVE AT CELLAR LEVEL NO PERMITS ON FILE FOR THE WORK DONE., OBTAIN PERMIT 101 — 28-105.1 WORK WITHOUT A PERMIT
39199897H
ACTIVE
October 20, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT A PERMIT. OBSERVED FULL-HEIGHT PARTITIONS INSTALLED AT CELLAR LEVEL FLOOR, CREATING A CLASS A APT WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR THREE-PIECE BATHROOM, KITCHEN AND 1 ROOM OCCUPIED FOR 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39199898J
ACTIVE
October 20, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT A PERMIT. OBSERVED FULL-HEIGHT PARTITIONS INSTALLED AT CELLAR LEVEL FLOOR, CREATING A CLASS A APT WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR THREE-PIECE BATHROOM, KITCHEN AND (1) ROOM OCCUPIED F 201 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Other Building / Code Compliance; Egress / Exit Obstruction. The hearing dates are October 20, 2026, October 6, 2026; the source issue date(s) are April 30, 2026, August 10, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 39186744Y

CLASS - 2 · Issued April 30, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE OF PERMIT HOLDER TO PROVIDE INSPECTION ACCESS TO &/OR EXPOSE ONGOING CONSTRUCTION OR WORK ON AN ACTIVE & PERMITTED WORKSITE.UPON INSPECTION OBSERVED WORKER PAINTING ENTRANCE&WORKER MOVING SAND AT EXP1.

Cited provision(s): 2A7 — 28-116.1 PERMIT HOLDER FAIL TO PROVIDE ACCESS AND/OR EXPOSE WORK ON ACTIVE SITE

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Egress / Exit Obstruction — Summons 39199896X

CLASS - 1 · Issued August 10, 2026; hearing October 20, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. THE BOILER ROOM IS NOT PROPERLY ENCLOSED IN THE CELLAR LEVEL WITH A FIRE-RATED DOOR OR FRESH AIR INTAKE. THE CELLAR HAS ONLY ONE MEANS OF EGRESS., REPAIR

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Work Without a Permit — Summons 39199899L

CLASS - 1 · Issued August 10, 2026; hearing October 20, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PLUMBING PERMIT NOTED; INSTALLED WATER AND WASTE LINE FOR 3PC BATHROOM, RESIDENTIAL SINK, AND ILLEGAL GAS LINE FOR GAS STOVE AT CELLAR LEVEL NO PERMITS ON FILE FOR THE WORK DONE., OBTAIN PERMIT

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39199897H

CLASS - 2 · Issued August 10, 2026; hearing October 20, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. OBSERVED FULL-HEIGHT PARTITIONS INSTALLED AT CELLAR LEVEL FLOOR, CREATING A CLASS A APT WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR THREE-PIECE BATHROOM, KITCHEN AND 1 ROOM OCCUPIED FOR

Cited provision(s): 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39199898J

CLASS - 2 · Issued August 10, 2026; hearing October 20, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. OBSERVED FULL-HEIGHT PARTITIONS INSTALLED AT CELLAR LEVEL FLOOR, CREATING A CLASS A APT WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS FOR THREE-PIECE BATHROOM, KITCHEN AND (1) ROOM OCCUPIED F

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.