BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 4198407

Queens property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 13, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughQueens
BIN4198407
Block / Lot09421 / 0032
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039199163Z (source ECB number 39199163Z). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39199163Z
ACTIVE
October 13, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT A PERMIT NOTED; AT CELLAR FLOOR ERECTED FULL HEIGHT PARTITION WALLS TO CREATE (2) BEDROOMS, AND BATHROOM. INSTALLED WATER & WASTE LINES FOR 3PC BATHROOM (SINK, SHOWER, TOILET), AND (1) RESIDENTIAL 201 — 28-105.1 WORK WITHOUT A PERMIT
39199166Y
ACTIVE
October 13, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT ELECTRIC PERMIT NOTED; PARTITION WALLS ERECTED WITH INSTALLED NEW ELECTRICAL OUTLETS AND LIGHTING IN ENTIRE CELLAR AREA., OBTAIN PERMIT 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39199164K
ACTIVE
October 13, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER THE BOILER ROOM IS NOT PROPERLY ENCLOSED IN THE CELLAR WITH A FIRE-RATED DOOR OR FRESH AIR INTAKE. THE CELLAR HAS ONLY ONE MEANS OF EGRESS., REPAIR AND/REPL 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39199162R
ACTIVE
October 13, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 OCCUPANCY CONTRARY TO THAT ALLOWED LEGAL 2 FAMILY, 2.00 STORY DWELLING WITH CELLAR AS BOILER ROOM AND STORAGE USE, HAS NOW BEEN CONVERTED FROM A 2-FAMILY TO 3-FAMILY DWELLING, WITH A CLASS A APT. AT CELLAR LEVE 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
39199165M
ACTIVE
October 13, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT A PERMIT NOTED; AT CELLAR FLOOR ERECTED FULL HEIGHT PARTITION WALLS TO CREATE (2) BEDROOMS, AND BATHROOM. INSTALLED WATER & WASTE LINES FOR 3PC BATHROOM (SINK, SHOWER, TOILET), AND (1) RESIDENTIAL 201 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Egress / Exit Obstruction; Illegal Occupancy / Conversion. The hearing date is October 13, 2026; the source issue date(s) are August 4, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39199163Z

CLASS - 2 · Issued August 4, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT NOTED; AT CELLAR FLOOR ERECTED FULL HEIGHT PARTITION WALLS TO CREATE (2) BEDROOMS, AND BATHROOM. INSTALLED WATER & WASTE LINES FOR 3PC BATHROOM (SINK, SHOWER, TOILET), AND (1) RESIDENTIAL

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39199166Y

CLASS - 2 · Issued August 4, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT ELECTRIC PERMIT NOTED; PARTITION WALLS ERECTED WITH INSTALLED NEW ELECTRICAL OUTLETS AND LIGHTING IN ENTIRE CELLAR AREA., OBTAIN PERMIT

Cited provision(s): 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Egress / Exit Obstruction — Summons 39199164K

CLASS - 1 · Issued August 4, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER THE BOILER ROOM IS NOT PROPERLY ENCLOSED IN THE CELLAR WITH A FIRE-RATED DOOR OR FRESH AIR INTAKE. THE CELLAR HAS ONLY ONE MEANS OF EGRESS., REPAIR AND/REPL

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Illegal Occupancy / Conversion — Summons 39199162R

CLASS - 1 · Issued August 4, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OCCUPANCY CONTRARY TO THAT ALLOWED LEGAL 2 FAMILY, 2.00 STORY DWELLING WITH CELLAR AS BOILER ROOM AND STORAGE USE, HAS NOW BEEN CONVERTED FROM A 2-FAMILY TO 3-FAMILY DWELLING, WITH A CLASS A APT. AT CELLAR LEVE

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Work Without a Permit — Summons 39199165M

CLASS - 2 · Issued August 4, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT NOTED; AT CELLAR FLOOR ERECTED FULL HEIGHT PARTITION WALLS TO CREATE (2) BEDROOMS, AND BATHROOM. INSTALLED WATER & WASTE LINES FOR 3PC BATHROOM (SINK, SHOWER, TOILET), AND (1) RESIDENTIAL

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.