What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Failure to Maintain; Construction Fence; Sidewalk Shed / Scaffold. The hearing date is October 6, 2026; the source issue date(s) are July 29, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Failure to Maintain — Summons 39198240Z
CLASS - 2 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING IN ACCORDANCE WITH SECTION REQUIREMENTS. AT THE TIME OF INSPECTION, EXCESSIVE CONSTRUCTION MATERIALS, DEBRIS AND GARBAGE WAS OBSERVED ON SCATTERED THROUGHOUT THE PREMIS
Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Construction Fence — Summons 39198241K
CLASS - 2 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION, TEMPORARY CONSTRUCTION EQUIPMENT ON SITE WITH EXPIRED PERMIT. CONSTRUCTION FENCE PERMIT NO. Q00666472 EXPIRED 08/03/2023 AND HAD NOT BEEN RENEWED AND POSTED AT THIS LOCATION., RENEW P
Cited provision(s): 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
How this type of condition is typically resolved
Construction-fence charges generally require bringing the fence, gates, viewing panels, height and site protection into compliance with the approved construction-safety setup and maintaining it for the required duration.
Hearing issues to verify
- Did the fence configuration on the inspection date match the approved/logistics plan?
- Was the cited opening or defect temporary and promptly corrected?
- Was a permit or construction-fence filing active where required?
Evidence that may matter
- Approved construction-fence/site logistics documents
- Dated photographs
- Contractor logs and correction invoice
- Permit/filing record
Sidewalk Shed / Scaffold — Summons 39198239L
CLASS - 2 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED IN ACCORDANCE WITH BC 3307.7. AT THE TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE AT RIGHT SIDE (EXP #4) OF PREMISES, BROKEN/MISSING LEAVING SITE OPEN AND UNGUARD
Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.