Queens property record with 8 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 6, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughQueens
BIN4255007
Block / Lot11755 / 0067
October Records8
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039198567K (source ECB number 39198567K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39198562L
ACTIVE
October 6, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT A PERMIT. NOTED AT EXP. 2 AND 3. OBSERVED A METAL FRAME STRUCTURE HAS BEEN INSTALLED CREATING CANOPY. CANOPY IS AFFIXED TO BUILDING, STANDS APPROX. 10FT HIGH AND EXTENDS THE ENTIRE LENGTH OF EXP. 2 201 — 28-105.1 WORK WITHOUT A PERMIT
39198565R
ACTIVE
October 6, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT A PERMIT. NOTED AT FRONT OF PREMISES. OBSERVED EXISTING FRONT PORCH HAS BEEN REMOVED AND NEW BRICK AND MORTAR PORCH HAS BEEN INSTALLED MEASURING APPROX. 7FT X 20FT X 4FT. ALSO, CANOPY HAS BEEN INST 201 — 28-105.1 WORK WITHOUT A PERMIT
39198573R
ACTIVE
October 6, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT A PERMIT. NOTED AT REAR OF 1ST LEVEL. INSTALLED WATER AND WASTE LINES FOR RESIDENTIAL SINK AND 3PC BATHROOM (SHOWER, SINK, TOILET). INSTALLED GAS LINE FOR GAS STOVE., OBTAIN PERMIT 101 — 28-105.1 WORK WITHOUT A PERMIT
39198563N
ACTIVE
October 6, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OCCUPANCY CONTRARY TO CERTIFICATE OF OCCUPANCY. CO #402590638F STATES BUILDING TO BE A 2-FAMILY DWELLING (1ST AND 2ND LEVEL). WORK NOTED AT REAR OF 1ST FLOOR. 1ST FLOOR HAS BEEN SUBDIVIDED AND SETUP AND OCCUPIE 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
39198566Z
ACTIVE
October 6, 2026
8:30 AM
CLASS - 3 PENDING $500.00 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED AT LEFT SIDE OF PREMISES. OBSERVED RAIN LEADER PIPE HAS BEEN REDIRECTED TOWARD FRONT OF PREMISES AND IS NOT PROPERLY CONNECTED TO A STORM DRAIN/DRY 302 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39198564P
ACTIVE
October 6, 2026
9:30 AM
CLASS - 2 PENDING $3,125.00 WORK W/O PERMIT. NOTED AT GARAGE. WOOD FRAME STRUCTURE HAS BEEN ADDED TO EXISTING GARAGE CREATING A VERTICAL/HORIZONTAL EXTENSION. EXTENSION MEASURES APPROX. 20FT X 20FT X 12FT. RESIDENTIAL DOORS AND WINDOWS IN 201 — 28-105.1 WORK WITHOUT A PERMIT
39198567K
ACTIVE
October 6, 2026
9:30 AM
CLASS - 3 PENDING $500.00 VIOLATION OF PLANTING REQUIREMENTS AT FRONT YARD. PLANTING AT FRONT YARD HAS BEEN REMOVED AND REPLACED WITH PAVERS. THIS USE IS PROHIBITED AS PER ZR 23-613; ZR 23-613, COMPLY WITH ZONING RESOLUTION 384 — ZR-MISC MISCELLANEOUS VIOLATIONS OF THE ZONING RESOLUTION
39198572P
ACTIVE
October 6, 2026
9:30 AM
CLASS - 3 PENDING $250.00 WORK WITHOUT A PERMIT. NOTED AT REAR OF 1ST LEVEL. ERECTED FULL HEIGHT PARTITION WALLS SUBDIVIDING 1ST LEVEL TO CREATE STUDIO APARTMENT AND BATHROOM., OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION 301 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 8 summons records for this property identifier. The charge mix is: 5 Work Without a Permit summonses; Illegal Occupancy / Conversion; Failure to Maintain; Zoning / Parking / Use. The hearing date is October 6, 2026; the source issue date(s) are July 30, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39198562L

CLASS - 2 · Issued July 30, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. NOTED AT EXP. 2 AND 3. OBSERVED A METAL FRAME STRUCTURE HAS BEEN INSTALLED CREATING CANOPY. CANOPY IS AFFIXED TO BUILDING, STANDS APPROX. 10FT HIGH AND EXTENDS THE ENTIRE LENGTH OF EXP. 2

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39198565R

CLASS - 2 · Issued July 30, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. NOTED AT FRONT OF PREMISES. OBSERVED EXISTING FRONT PORCH HAS BEEN REMOVED AND NEW BRICK AND MORTAR PORCH HAS BEEN INSTALLED MEASURING APPROX. 7FT X 20FT X 4FT. ALSO, CANOPY HAS BEEN INST

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39198573R

CLASS - 1 · Issued July 30, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. NOTED AT REAR OF 1ST LEVEL. INSTALLED WATER AND WASTE LINES FOR RESIDENTIAL SINK AND 3PC BATHROOM (SHOWER, SINK, TOILET). INSTALLED GAS LINE FOR GAS STOVE., OBTAIN PERMIT

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Illegal Occupancy / Conversion — Summons 39198563N

CLASS - 1 · Issued July 30, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OCCUPANCY CONTRARY TO CERTIFICATE OF OCCUPANCY. CO #402590638F STATES BUILDING TO BE A 2-FAMILY DWELLING (1ST AND 2ND LEVEL). WORK NOTED AT REAR OF 1ST FLOOR. 1ST FLOOR HAS BEEN SUBDIVIDED AND SETUP AND OCCUPIE

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Failure to Maintain — Summons 39198566Z

CLASS - 3 · Issued July 30, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED AT LEFT SIDE OF PREMISES. OBSERVED RAIN LEADER PIPE HAS BEEN REDIRECTED TOWARD FRONT OF PREMISES AND IS NOT PROPERLY CONNECTED TO A STORM DRAIN/DRY

Cited provision(s): 302 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 39198564P

CLASS - 2 · Issued July 30, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK W/O PERMIT. NOTED AT GARAGE. WOOD FRAME STRUCTURE HAS BEEN ADDED TO EXISTING GARAGE CREATING A VERTICAL/HORIZONTAL EXTENSION. EXTENSION MEASURES APPROX. 20FT X 20FT X 12FT. RESIDENTIAL DOORS AND WINDOWS IN

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Zoning / Parking / Use — Summons 39198567K

CLASS - 3 · Issued July 30, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: VIOLATION OF PLANTING REQUIREMENTS AT FRONT YARD. PLANTING AT FRONT YARD HAS BEEN REMOVED AND REPLACED WITH PAVERS. THIS USE IS PROHIBITED AS PER ZR 23-613; ZR 23-613, COMPLY WITH ZONING RESOLUTION

Cited provision(s): 384 — ZR-MISC MISCELLANEOUS VIOLATIONS OF THE ZONING RESOLUTION

How this type of condition is typically resolved

Zoning charges require comparing the observed use, parking arrangement or physical condition to the applicable zoning district, lawful occupancy and any prior approvals or variances. Correction can mean stopping the use, restoring required parking, or pursuing a lawful approval if available.

Hearing issues to verify

  • Is the cited zoning district/use classification correct for this lot?
  • Was the alleged use actually occurring on the issue date?
  • Is there a prior BSA/CPC/DOB approval, variance or grandfathered condition relevant to the charge?

Evidence that may matter

  • Zoning map and ZOLA/property records
  • Certificate of Occupancy / approved plans
  • Survey or parking layout
  • Prior approvals, variances, permits and dated photographs

Work Without a Permit — Summons 39198572P

CLASS - 3 · Issued July 30, 2026; hearing October 6, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. NOTED AT REAR OF 1ST LEVEL. ERECTED FULL HEIGHT PARTITION WALLS SUBDIVIDING 1ST LEVEL TO CREATE STUDIO APARTMENT AND BATHROOM., OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION

Cited provision(s): 301 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 8 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.