BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 4258002

Queens property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 13, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughQueens
BIN4258002
Block / Lot11937 / 0082
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039199410R (source ECB number 39199410R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39199410R
ACTIVE
October 13, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 RCA ISSUED 04/08/25 TO SAME RESPONDENT NOT CORRECTED AT REAR ERECTED A 1 STORY STEEL CANOPY ATTACHED TO SHED & GROUND, FROM LOT LINE TO LOT LINE W/ ELECTRICAL LINES FOR LIGHTING, ALSO AN AWNING ERECTED ATTACHED 201 — 28-105.1 WORK WITHOUT A PERMIT
39199413M
ACTIVE
October 13, 2026
10:30 AM
CLASS - 2 PENDING $800.00 RCA ISSUED 04/08/25 TO SAME RESPONDENT & NOT CORRECTED WORK WITHOUT A PERMIT AT RIGHT SIDE OF PREMISES HVAC WALL MOUNTED UNIT INSTALLED THROUGH FACADE OF BUILDING CODE REQUIRES PERMIT FOR INSTALLATION OR REMOVA 2C9 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
39199411Z
ACTIVE
October 13, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 RCA ISSUED 04/08/25 TO SAME RESPONDENT NOT CORRECTED WORK W/OUT PERMIT AT REAR ERECTED A 1 STORY SHED ATTACHED TO THE GROUND WITH A RESIDENTIAL DOOR, WINDOW, CABINET ERECTED AT RIGHT OF SHED, DEPT. RECORDS INDI 201 — 28-105.1 WORK WITHOUT A PERMIT
39199414Y
ACTIVE
October 13, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 RCA ISSUED 04/08/25 TO SAME RESPONDENT NOT CORRECTED FRONT LEADER PIPE NOT CONNECTED TO DRAINAGE AS REQUIRED, AT REAR ACCUMULATION OF COMBUSTIBLE DEBRIS, PORTABLE GAS CONTAINER, BARRELS OF UNKNOWN, BOXES ALL ST 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39199412K
ACTIVE
October 13, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 RCA ISSUED 04/08/25 TO SAME RESPONDENT & NOT CORRECTED FRONT YARD PLANTING AREA HAS BEEN FULLY REMOVED & REPLACED WITH CONCRETE & PAVER STONES, IN VIOLATION OF SECTION ZR23-613, PROPERTY DOES NOT MEET REQUIREME 284 — ZR-MISC MISCELLANEOUS VIOLATIONS OF THE ZONING RESOLUTION

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Failure to Maintain; Zoning / Parking / Use. The hearing date is October 13, 2026; the source issue date(s) are August 6, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39199410R

CLASS - 2 · Issued August 6, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RCA ISSUED 04/08/25 TO SAME RESPONDENT NOT CORRECTED AT REAR ERECTED A 1 STORY STEEL CANOPY ATTACHED TO SHED & GROUND, FROM LOT LINE TO LOT LINE W/ ELECTRICAL LINES FOR LIGHTING, ALSO AN AWNING ERECTED ATTACHED

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39199413M

CLASS - 2 · Issued August 6, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RCA ISSUED 04/08/25 TO SAME RESPONDENT & NOT CORRECTED WORK WITHOUT A PERMIT AT RIGHT SIDE OF PREMISES HVAC WALL MOUNTED UNIT INSTALLED THROUGH FACADE OF BUILDING CODE REQUIRES PERMIT FOR INSTALLATION OR REMOVA

Cited provision(s): 2C9 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39199411Z

CLASS - 2 · Issued August 6, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RCA ISSUED 04/08/25 TO SAME RESPONDENT NOT CORRECTED WORK W/OUT PERMIT AT REAR ERECTED A 1 STORY SHED ATTACHED TO THE GROUND WITH A RESIDENTIAL DOOR, WINDOW, CABINET ERECTED AT RIGHT OF SHED, DEPT. RECORDS INDI

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39199414Y

CLASS - 2 · Issued August 6, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RCA ISSUED 04/08/25 TO SAME RESPONDENT NOT CORRECTED FRONT LEADER PIPE NOT CONNECTED TO DRAINAGE AS REQUIRED, AT REAR ACCUMULATION OF COMBUSTIBLE DEBRIS, PORTABLE GAS CONTAINER, BARRELS OF UNKNOWN, BOXES ALL ST

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Zoning / Parking / Use — Summons 39199412K

CLASS - 2 · Issued August 6, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RCA ISSUED 04/08/25 TO SAME RESPONDENT & NOT CORRECTED FRONT YARD PLANTING AREA HAS BEEN FULLY REMOVED & REPLACED WITH CONCRETE & PAVER STONES, IN VIOLATION OF SECTION ZR23-613, PROPERTY DOES NOT MEET REQUIREME

Cited provision(s): 284 — ZR-MISC MISCELLANEOUS VIOLATIONS OF THE ZONING RESOLUTION

How this type of condition is typically resolved

Zoning charges require comparing the observed use, parking arrangement or physical condition to the applicable zoning district, lawful occupancy and any prior approvals or variances. Correction can mean stopping the use, restoring required parking, or pursuing a lawful approval if available.

Hearing issues to verify

  • Is the cited zoning district/use classification correct for this lot?
  • Was the alleged use actually occurring on the issue date?
  • Is there a prior BSA/CPC/DOB approval, variance or grandfathered condition relevant to the charge?

Evidence that may matter

  • Zoning map and ZOLA/property records
  • Certificate of Occupancy / approved plans
  • Survey or parking layout
  • Prior approvals, variances, permits and dated photographs

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.