BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 4258238

Queens property record with 11 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 1, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Illegal Occupancy / Conversion

BoroughQueens
BIN4258238
Block / Lot11946 / 0092
October Records11
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039149881H (source ECB number 39149881H). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39149872X
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT CELLAR LEVEL THERE ARE 5 SRO'S INCLUDING ROOM 1 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES, RESTOR 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39149873H
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT FIRST FLOOR THERE ARE 3 SRO'S INCLUDING ROOM 3 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES (REAR LE 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39149874J
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT CELLAR LEVEL THERE ARE 5 SRO'S INCLUDING ROOM 3 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES, RESTOR 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39149875L
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $12,500.00 WORK WITHOUT PERMIT. AT BASEMENT AND ATTIC LEVEL A 3PIECE BATHROOM WITH SINK, SHOWER AND TOILET ALONG WITH FULL HEIGHT PARTITIONS AND ELECTRICAL WIT LIGHT FIXTURES SWITCHES AND RECEPTACLES. THERE ARE NO PERMITS 101 — 28-105.1 WORK WITHOUT A PERMIT
39149876N
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT CELLAR LEVEL THERE ARE 5 SRO'S INCLUDING KITCHEN WITH GAS LINE FOR GAS STOVE 3 PIECE BATHROOM WITH SINK SHOWER AND 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39149877P
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT FIRST FLOOR LEVEL THERE ARE 3 SRO'S INCLUDING ROOM 1 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES (F 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39149878R
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 DEFAULT $60,030.00 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT FIRST FLOOR THERE ARE 3 SRO'S INCLUDING ROOM 2 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES (MIDDLE 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39149879Z
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT CELLAR LEVEL THERE ARE 5 SRO'S INCLUDING ROOM 2 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES (FRONT 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39149880X
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT CELLAR LEVEL THERE ARE 5 SRO'S INCLUDING ROOM 1 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES (ROOM 5 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39149881H
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT SECOND FLOOR THERE ARE 3 SRO'S INCLUDING ROOM 1 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES, RESTOR 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39149882J
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT ATTIC THERE AIS A CLASS A APARTMENT INCLUDING FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES WITH KITCHENAN 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 11 summons records for this property identifier. The charge mix is: 10 Illegal Occupancy / Conversion summonses; Work Without a Permit. The hearing date is October 1, 2026; the source issue date(s) are June 3, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Illegal Occupancy / Conversion — Summons 39149872X

CLASS - 1 · Issued June 3, 2025; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT CELLAR LEVEL THERE ARE 5 SRO'S INCLUDING ROOM 1 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES, RESTOR

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Illegal Occupancy / Conversion — Summons 39149873H

CLASS - 1 · Issued June 3, 2025; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT FIRST FLOOR THERE ARE 3 SRO'S INCLUDING ROOM 3 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES (REAR LE

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Illegal Occupancy / Conversion — Summons 39149874J

CLASS - 1 · Issued June 3, 2025; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT CELLAR LEVEL THERE ARE 5 SRO'S INCLUDING ROOM 3 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES, RESTOR

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Work Without a Permit — Summons 39149875L

CLASS - 1 · Issued June 3, 2025; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT. AT BASEMENT AND ATTIC LEVEL A 3PIECE BATHROOM WITH SINK, SHOWER AND TOILET ALONG WITH FULL HEIGHT PARTITIONS AND ELECTRICAL WIT LIGHT FIXTURES SWITCHES AND RECEPTACLES. THERE ARE NO PERMITS

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Illegal Occupancy / Conversion — Summons 39149876N

CLASS - 1 · Issued June 3, 2025; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT CELLAR LEVEL THERE ARE 5 SRO'S INCLUDING KITCHEN WITH GAS LINE FOR GAS STOVE 3 PIECE BATHROOM WITH SINK SHOWER AND

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Illegal Occupancy / Conversion — Summons 39149877P

CLASS - 1 · Issued June 3, 2025; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT FIRST FLOOR LEVEL THERE ARE 3 SRO'S INCLUDING ROOM 1 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES (F

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Illegal Occupancy / Conversion — Summons 39149878R

CLASS - 1 · Issued June 3, 2025; hearing October 1, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT FIRST FLOOR THERE ARE 3 SRO'S INCLUDING ROOM 2 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES (MIDDLE

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Illegal Occupancy / Conversion — Summons 39149879Z

CLASS - 1 · Issued June 3, 2025; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT CELLAR LEVEL THERE ARE 5 SRO'S INCLUDING ROOM 2 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES (FRONT

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Illegal Occupancy / Conversion — Summons 39149880X

CLASS - 1 · Issued June 3, 2025; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT CELLAR LEVEL THERE ARE 5 SRO'S INCLUDING ROOM 1 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES (ROOM 5

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Illegal Occupancy / Conversion — Summons 39149881H

CLASS - 1 · Issued June 3, 2025; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT SECOND FLOOR THERE ARE 3 SRO'S INCLUDING ROOM 1 WITH FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES, RESTOR

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Illegal Occupancy / Conversion — Summons 39149882J

CLASS - 1 · Issued June 3, 2025; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3 OR MORE ADDITIONAL UNITS ABOVE WHAT IS ALLOWED BY THE C OF O OR OTHER DEPARTMENT RECORDS. AT ATTIC THERE AIS A CLASS A APARTMENT INCLUDING FULL HEIGHT PARTITIONS ERECTED AND KEY LOCKING DEVICES WITH KITCHENAN

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Case-specific next step

For this property, the first paid review should reconcile the 11 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.