What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 4 Work Without a Permit summonses; Illegal Occupancy / Conversion; Failure to Maintain. The hearing dates are October 20, 2026, October 6, 2026; the source issue date(s) are July 28, 2026, June 17, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Work Without a Permit — Summons 39198110K
CLASS - 1 · Issued July 28, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITHOUT A PERMIT. OBSERVED FULL-HEIGHT PARTITIONS INSTALLED AT CELLAR, CREATING 3 ROOMS AND A THREE-PIECE BATHROOM WITH LIGHT FIXTURES AND SWITCHES/ OUTLETS. NO PERMIT ON FILE FOR ELECTRICAL WORK PERFORMED
Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 39198108L
CLASS - 2 · Issued July 28, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITHOUT A PERMIT. OBSERVED FULL-HEIGHT PARTITIONS INSTALLED AT CELLAR, CREATING 3 ROOMS, A THREE-PIECE BATHROOM AND KITCHENETTE. NO PERMIT ON FILE FOR CONSTRUCTION WORK PERFORMED, OBTAIN ALL PERMITS
Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 39198109N
CLASS - 2 · Issued July 28, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITHOUT A PERMIT. OBSERVED AT CELLAR LEVEL WATER AND WASTE LINES FOR A 3-PC BATHROOM AND RESIDENTIAL SINK. NO PLUMBING PERMIT ON FILE FOR WORK PERFORMED., OBTAIN ALL PERMITS
Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Illegal Occupancy / Conversion — Summons 39192988L
CLASS - 1 · Issued June 17, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION NOTED; ILLEGAL USED IN A RESIDENTIAL SPACE THE GARAGE LOCATED AT (EXPOSURE 4) WAS BEING USED AS AN AUTOMOTIVE DETAILING/MECHANIC SHOP WITHIN A RESIDENTIAL PROPERTY. INCLUDED VEHICLES B
Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
How this type of condition is typically resolved
The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.
Hearing issues to verify
- What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
- Did the inspector accurately identify how the space was being used on the cited date?
- Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
- Is there an approved filing or historical record supporting the present use?
Evidence that may matter
- Certificate of Occupancy / Schedule of Occupancy and approved plans
- Historic occupancy records, permits and prior approved layouts
- Dated photographs and floor plans
- Leases, tenant records or sworn statements concerning actual use
- Permits/inspection records if the condition was legalized or restored
Failure to Maintain — Summons 39192989N
CLASS - 3 · Issued June 17, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN NOTED; GUTTERS AND LEADERS WERE MISSING FROM MULTIPLE AREAS OF THE PREMISES WHERE REQUIRED FOR PROPER DRAINAGE. THE ABSENCE OF THESE DRAINAGE COMPONENTS ALLOWS ROOF RUNOFF AND STORMWATER TO
Cited provision(s): 302 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Work Without a Permit — Summons 39192990K
CLASS - 2 · Issued June 17, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITHOUT A PERMIT NOTED; A WOOD-FRAMED STRUCTURE ERECTED AT THE REAR (EXPOSURE 2) AND LEFT SIDE (EXPOSURE 4) OF THE PREMISES. THE STRUCTURE IS ATTACHED TO AND EXTENDS FROM THE EXISTING GARAGE TO THE NEIGHBO
Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review