BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 4296614

Queens property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 13, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Failure to Maintain

BoroughQueens
BIN4296614
Block / Lot15004 / 0001
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039177401H (source ECB number 39177401H). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39177399H
ACTIVE
October 13, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS 39128985J., FILE A CERTIFICATE OF CORRECTION 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
39177400X
ACTIVE
October 13, 2026
8:30 AM
CLASS - 1 PENDING $6,250.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE) FOR SUMMONS 39128982Y. OBSERVED NO FIRE-STOPPING AT ALL HOLE PENETRATIONS THROUGH 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
39177401H
ACTIVE
October 13, 2026
8:30 AM
CLASS - 1 PENDING $6,250.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8 (2014 CODE); 27-371; BC 1008.1.9 (2014 CODE); BC 1010.1.8 (2022 CODE); BC 1010.1.9 (2022 CODE) FOR S 126 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBIT
39177402J
ACTIVE
October 13, 2026
8:30 AM
CLASS - 1 PENDING $6,250.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER FOR SUMMONS 39128994L. OBSERVED RESIDENTIAL GAS FLEX ON COMMERCIAL LAUNDRY EQUIPMENT (6 DRYERS)., REPAIR AND/REPLACE 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39177403L
ACTIVE
October 13, 2026
8:30 AM
CLASS - 1 PENDING $4,000.00 UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE FOR SUMMONS 39128987N. OBSERVED THE USE OF FLEXIBLE CORDS AS PERMANENT WIRING AT PARKING LOT, GAS ME 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
39177404N
ACTIVE
October 13, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS 39128988P., FILE A CERTIFICATE OF CORRECTION 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 3 Failure to Maintain summonses; 2 Certificate of Correction / Commissioner Order summonses; Electrical Work / Electrical Permit. The hearing date is October 13, 2026; the source issue date(s) are February 17, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Certificate of Correction / Commissioner Order — Summons 39177399H

CLASS - 2 · Issued February 17, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS 39128985J., FILE A CERTIFICATE OF CORRECTION

Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB

How this type of condition is typically resolved

This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.

Hearing issues to verify

  • Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
  • Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
  • Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?

Evidence that may matter

  • DOB NOW / AEU Certificate of Correction submission or approval record
  • Before-and-after photographs tied to the cited condition
  • Permits, inspection results, contractor receipts or professional statements supporting the correction
  • Proof of applicable DOB civil-penalty payment or waiver, if required

Failure to Maintain — Summons 39177400X

CLASS - 1 · Issued February 17, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE) FOR SUMMONS 39128982Y. OBSERVED NO FIRE-STOPPING AT ALL HOLE PENETRATIONS THROUGH

Cited provision(s): 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Failure to Maintain — Summons 39177401H

CLASS - 1 · Issued February 17, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8 (2014 CODE); 27-371; BC 1008.1.9 (2014 CODE); BC 1010.1.8 (2022 CODE); BC 1010.1.9 (2022 CODE) FOR S

Cited provision(s): 126 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBIT

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Failure to Maintain — Summons 39177402J

CLASS - 1 · Issued February 17, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER FOR SUMMONS 39128994L. OBSERVED RESIDENTIAL GAS FLEX ON COMMERCIAL LAUNDRY EQUIPMENT (6 DRYERS)., REPAIR AND/REPLACE

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Electrical Work / Electrical Permit — Summons 39177403L

CLASS - 1 · Issued February 17, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE FOR SUMMONS 39128987N. OBSERVED THE USE OF FLEXIBLE CORDS AS PERMANENT WIRING AT PARKING LOT, GAS ME

Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

How this type of condition is typically resolved

Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.

Hearing issues to verify

  • Was there an active electrical application/permit covering the cited wiring or equipment?
  • Was the condition already corrected or disconnected before the inspection date?
  • Does the cited equipment/location match the permitted scope and electrical inspection record?

Evidence that may matter

  • Electrical permit/application and inspection records
  • Licensed electrician invoice, letter or work order
  • Photographs of wiring/equipment before and after correction
  • Testing, certification or utility documentation where relevant

Certificate of Correction / Commissioner Order — Summons 39177404N

CLASS - 2 · Issued February 17, 2026; hearing October 13, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS 39128988P., FILE A CERTIFICATE OF CORRECTION

Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB

How this type of condition is typically resolved

This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.

Hearing issues to verify

  • Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
  • Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
  • Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?

Evidence that may matter

  • DOB NOW / AEU Certificate of Correction submission or approval record
  • Before-and-after photographs tied to the cited condition
  • Permits, inspection results, contractor receipts or professional statements supporting the correction
  • Proof of applicable DOB civil-penalty payment or waiver, if required

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.