BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 4311708

Queens property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 27, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughQueens
BIN4311708
Block / Lot04973 / 0045
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039201449Y (source ECB number 39201449Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39201447K
ACTIVE
October 27, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 AT TIME OF INSPECTION OBSERVED PLUMBING WORK DONE WITHOUT A PERMIT. PRESSURIZED REFRIGERANT LINES RUN TROUGH WALLS CONNECTING A/C SPLIT UNIT TO A CONDENSER UNIT AT EXP3. AND DRINE LINES RUN TROUGH WALL TO BATHR 201 — 28-105.1 WORK WITHOUT A PERMIT
39201450L
ACTIVE
October 27, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED OCCUPANCY CONTRARY TO COFO. ON RECORD IS A OFFICE SPACE AT 3RD FLOOR. UPON INSPECTION OBSERVED SPACE BEING USED AS A ILLEGAL ADULT ESTABLISHMENT. WITH 10 BEDS LAY OUT THROUGHOUT 3RD FLOOR UNIT., D 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
39201448M
ACTIVE
October 27, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN, OBSERVED COMPROMISED FIRE RATING TROUGHT 3RD FLOOR UNIT. MULTIPLE HOLES IN CEILING AND WALLS WHICH COMPROMISING THE FIRE RATING OF THE UNIT IN CASE OF EMERGENCY., REPAIR AND/REPLACE 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39201446Z
ACTIVE
October 27, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 AT TIME OF INSPECTION OBSERVED ELECTRICAL WORK DON'T WITHOUT A PERMIT, OBSERVED ELECTRICAL WIRE RAN THROUGHOUT 3RD FLOOR UNIT, HANGING FROM CEILING AND WALLS. ELECTRICAL CONNECTION FOR SPLIT A/C UNIT ALL DONE W 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39201449Y
ACTIVE
October 27, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN ACTIVE SPRINKLER SYSTEM, OBSERVED A NUMBER OF SPRINKLER HEADS PAINTED OVER AND COVERED WITH TAPE AND PAPER, OBSTRUCTING THE DISCHARGE AND SAFE ACTIVATION IN THE EVENT OF A FIRE., REPAIR AND/ 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses; 2 Failure to Maintain summonses; Illegal Occupancy / Conversion. The hearing date is October 27, 2026; the source issue date(s) are August 22, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39201447K

CLASS - 2 · Issued August 22, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED PLUMBING WORK DONE WITHOUT A PERMIT. PRESSURIZED REFRIGERANT LINES RUN TROUGH WALLS CONNECTING A/C SPLIT UNIT TO A CONDENSER UNIT AT EXP3. AND DRINE LINES RUN TROUGH WALL TO BATHR

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Illegal Occupancy / Conversion — Summons 39201450L

CLASS - 1 · Issued August 22, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED OCCUPANCY CONTRARY TO COFO. ON RECORD IS A OFFICE SPACE AT 3RD FLOOR. UPON INSPECTION OBSERVED SPACE BEING USED AS A ILLEGAL ADULT ESTABLISHMENT. WITH 10 BEDS LAY OUT THROUGHOUT 3RD FLOOR UNIT., D

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Failure to Maintain — Summons 39201448M

CLASS - 1 · Issued August 22, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN, OBSERVED COMPROMISED FIRE RATING TROUGHT 3RD FLOOR UNIT. MULTIPLE HOLES IN CEILING AND WALLS WHICH COMPROMISING THE FIRE RATING OF THE UNIT IN CASE OF EMERGENCY., REPAIR AND/REPLACE

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 39201446Z

CLASS - 2 · Issued August 22, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED ELECTRICAL WORK DON'T WITHOUT A PERMIT, OBSERVED ELECTRICAL WIRE RAN THROUGHOUT 3RD FLOOR UNIT, HANGING FROM CEILING AND WALLS. ELECTRICAL CONNECTION FOR SPLIT A/C UNIT ALL DONE W

Cited provision(s): 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39201449Y

CLASS - 1 · Issued August 22, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN ACTIVE SPRINKLER SYSTEM, OBSERVED A NUMBER OF SPRINKLER HEADS PAINTED OVER AND COVERED WITH TAPE AND PAPER, OBSTRUCTING THE DISCHARGE AND SAFE ACTIVATION IN THE EVENT OF A FIRE., REPAIR AND/

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.