What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Elevator / Vertical Transportation; Other Building / Code Compliance. The hearing date is October 6, 2026; the source issue date(s) are July 29, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Elevator / Vertical Transportation — Summons 39198197M
CLASS - 1 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: CLASS 1 C/U: 1. DOOR ZONE RESTRICTOR INOPERATIVE AS PER ASME A17.1 2.12 AND 2.14, CREATING AN UNSAFE CONDITION. 2. SIGNIFICANT WATER ACCUMULATION IN THE ELEVATOR PIT AS PER ASME A17.1 8.6 AND NYC ADMINISTRATIVE
Cited provision(s): 151 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
How this type of condition is typically resolved
Elevator charges often require licensed-elevator maintenance or repair, the required periodic inspection/test filing, an affirmation of correction where applicable, and reinspection for hazardous conditions.
Hearing issues to verify
- Does the device number/location on the summons match the building's elevator record?
- Was the cited defect repaired or the device removed from service before the inspection?
- Were the required CAT/periodic inspection filings timely and accepted?
Evidence that may matter
- Elevator device record and inspection/test reports
- Maintenance contractor logs and repair tickets
- Affirmation of Correction / reinspection result
- Photographs or controller/service records
Other Building / Code Compliance — Summons 39198251Y
CLASS - 2 · Issued July 29, 2026; hearing October 6, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS. OBSERVED IN THE BASEMENT THAT THE BUILDING MAIN ELECTRICAL WATER GROUND CLAMP AND LUG IS DETREATED AND STARTING TO OXIDIZE CAUSING A THE MAIN ELECTRI
Cited provision(s): 2E2 — EC 250.4 FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review