What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Work Without a Permit; Sidewalk Shed / Scaffold; Site Safety / Safeguarding. The hearing date is October 20, 2026; the source issue date(s) are August 12, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Work Without a Permit — Summons 39557857K
CLASS - 2 · Issued August 12, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: DURING INSPECTION OF A SCHOOL WITH A 8 FOOT HIGH CONSTRUCTION FENCE AT EXPOSURE#1/4 AND A 4 FOOT HIGH FENCE AT EXPOSURE #1/2 DOB RECORDS REVEALED THAT THERE WAS NO PERMITS FOR THE INSTALL CONSTRUCTION FENCE WHI
Cited provision(s): 2L1 — 28-105.1 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATIO
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Sidewalk Shed / Scaffold — Summons 39557858M
CLASS - 2 · Issued August 12, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: DURING INSPECTION OF A SCHOOL WITH A CONSTRUCTION FENCE IN PLACE AT 8 FEET ON ONE SIDE AND 4 FEET ON ANOTHER, THE CODE REQUIRES THAT A CONSTRUCTION FENCE BE INSTALLED AT 8 FEET AND MUST FULL ENCLOSE THE MATERI
Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Site Safety / Safeguarding — Summons 39557856Z
CLASS - 2 · Issued August 12, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: DURING INSPECTION OF A SCHOOL, I OBSERVED SEVERAL STEEL BEAMS STACKED OVER 4 FEET HIGH, AND SEVERAL THAT HAD COLLAPSED AND WAS LEANING OUTWARD ON THE INADEQUATE 4 FOOT UNPERMITTED HIGH FENCE. THE REMAINING STAC
Cited provision(s): 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review