BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 4518444

Queens property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 27, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughQueens
BIN4518444
Block / Lot14248 / 1387
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039189852P (source ECB number 39189852P). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39189849Y
ACTIVE
October 27, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED OGOING CONSRUCTION OF STAND-UP SHOWER FRAME INSIDE 1ST FLR BOILER ROOM WITH NEW ELECTRICAL ; WIRING, LIGHTING, EXHAUST FAN & SWITCHES. ALSO OBSERVED INSTALLATION OF NEW WATER HEATER & NEW CENTRAL 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39189850L
ACTIVE
October 27, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 ATOI ONGOING CONSTRUCTION OF STAND-UP SHOWER FRAME INSIDE 1ST FLR BOILER ROOM. WORK APRX. 80% COMPLETE. NO PERMIT ON FILE. PSWO ISSUED., OBTAIN ALL PERMITS 201 — 28-105.1 WORK WITHOUT A PERMIT
39189851N
ACTIVE
October 27, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED THE CONSTRUCTION OF STAND-UP SHOWER FRAME INSIDE 1ST FLR BOILER ROOM, ALSO GAS PIPE IN CELLAR NOT CAPPED, POSING POTENTIAL HAZARDOUS CONDITION., REPAIR AND/OR REPLACE 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39189852P
ACTIVE
October 27, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED ONGOING CONSTRUCTION OF STAND-UP SHOWER INSIDE 1ST FLR BOILER ROOM WITH NEW PLUMBING CONNECTIONS; COPPER WATER & WASTE LINES EXTENDED TO CELLAR. ASLO, INSTALLATION OF NEW WATER HEATER WITH NEW/EX 201 — 28-105.1 WORK WITHOUT A PERMIT
39189853R
ACTIVE
October 27, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 ATOI OBSERVED NEW CENTRAL A/C & HEAT UNITS INSTALLED WITH ITS DUCTING WORK THROUGHOUT. WORK APPEARS 100% COMPLETE. VIOLATION ISSUED., OBTAIN ALL PERMITS 201 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 4 Work Without a Permit summonses; Boiler / HVAC / Service Equipment. The hearing date is October 27, 2026; the source issue date(s) are May 26, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39189849Y

CLASS - 2 · Issued May 26, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED OGOING CONSRUCTION OF STAND-UP SHOWER FRAME INSIDE 1ST FLR BOILER ROOM WITH NEW ELECTRICAL ; WIRING, LIGHTING, EXHAUST FAN & SWITCHES. ALSO OBSERVED INSTALLATION OF NEW WATER HEATER & NEW CENTRAL

Cited provision(s): 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39189850L

CLASS - 2 · Issued May 26, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI ONGOING CONSTRUCTION OF STAND-UP SHOWER FRAME INSIDE 1ST FLR BOILER ROOM. WORK APRX. 80% COMPLETE. NO PERMIT ON FILE. PSWO ISSUED., OBTAIN ALL PERMITS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Boiler / HVAC / Service Equipment — Summons 39189851N

CLASS - 2 · Issued May 26, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED THE CONSTRUCTION OF STAND-UP SHOWER FRAME INSIDE 1STÂ FLR BOILER ROOM, ALSO GAS PIPE IN CELLAR NOT CAPPED, POSING POTENTIAL HAZARDOUS CONDITION., REPAIR AND/OR REPLACE

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.

Hearing issues to verify

  • Was the cited device in service at the time alleged?
  • Was the equipment already repaired, disconnected or removed?
  • Do required annual inspection / filing records show compliance for the relevant cycle?

Evidence that may matter

  • Licensed contractor maintenance/repair records
  • Inspection and testing results
  • Device-status or annual filing records
  • Utility/CO testing records and photographs where relevant

Work Without a Permit — Summons 39189852P

CLASS - 2 · Issued May 26, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED ONGOING CONSTRUCTION OF STAND-UP SHOWER INSIDE 1STÂ FLR BOILER ROOM WITH NEW PLUMBING CONNECTIONS; COPPER WATER & WASTE LINES EXTENDED TO CELLAR. ASLO, INSTALLATION OF NEW WATER HEATER WITH NEW/EX

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39189853R

CLASS - 2 · Issued May 26, 2026; hearing October 27, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED NEW CENTRAL A/C & HEAT UNITS INSTALLED WITH ITS DUCTING WORK THROUGHOUT. WORK APPEARS 100% COMPLETE. VIOLATION ISSUED., OBTAIN ALL PERMITS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.