October 2026 NYC DOB / OATH Hearing — BIN 4594064

Queens property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 2, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughQueens
BIN4594064
Block / Lot06485 / 0003
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035686772R (source ECB number 35686772R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35686772R
ACTIVE
October 2, 2026
9:00 AM
CLASS - 1 DEFAULT $12,500.00 FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER'S. OWNER/RESPONDENT FAILED TO COMPLY WITH PREVIOUS VIOLATIONS #35685442J AND 092824LL08-03AK ISSUED ON 09/28/24. AS OF DATE OF INSPECTION 11/15/24 NO SHED AT 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
35689725H
ACTIVE
October 2, 2026
9:00 AM
CLASS - 1 DEFAULT $25,000.00 FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED. AS PER VIOLATION 092824LL0803AK REQUESTING THE IMMEDIATE ERECTION OF SIDEWALK SHED AT EXPOSURES 1, 2, 3 AND 4 AT TIME OF INSPECTION IT WAS OBSERVED SIDEWALK SHED 131 — BC 3307.3.1,27-102(A) FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Other Building / Code Compliance; Sidewalk Shed / Scaffold. The hearing date is October 2, 2026; the source issue date(s) are January 16, 2025, November 15, 2024.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 35686772R

CLASS - 1 · Issued November 15, 2024; hearing October 2, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER'S. OWNER/RESPONDENT FAILED TO COMPLY WITH PREVIOUS VIOLATIONS #35685442J AND 092824LL08-03AK ISSUED ON 09/28/24. AS OF DATE OF INSPECTION 11/15/24 NO SHED AT

Cited provision(s): 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Sidewalk Shed / Scaffold — Summons 35689725H

CLASS - 1 · Issued January 16, 2025; hearing October 2, 2026. · Hearing status: DEFAULT

DOB allegation in the source extract: FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED. AS PER VIOLATION 092824LL0803AK REQUESTING THE IMMEDIATE ERECTION OF SIDEWALK SHED AT EXPOSURES 1, 2, 3 AND 4 AT TIME OF INSPECTION IT WAS OBSERVED SIDEWALK SHED

Cited provision(s): 131 — BC 3307.3.1,27-102(A) FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.