This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 2 Site Safety / Safeguarding summonses; Sidewalk Shed / Scaffold; Work Without a Permit; Other Building / Code Compliance. The hearing date is October 20, 2026; the source issue date(s) are August 8, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Sidewalk Shed / Scaffold — Summons 39557830K
CLASS - 2 · Issued August 8, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BC3314.4.8 OBSERVED ACTIVE SITE SUPPORTED SCAFFOLD INSTALLED ON EXP 1,2 WORKERS ON DUTIES ,SUPPORTED SCAFFOLD WITHOUT GUARDRAILS TOE BORDS AND INADEQUATE DEBRIS NETTING CREATING HAZARDS CONDITIONS FOR WORKERS
Cited provision(s): 2P7
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Work Without a Permit — Summons 39557756L
CLASS - 1 · Issued August 8, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVE: ACTIVE SITE UPON REQUEST FOR AFTER HOUR VARIANCE PERMIT NONE WAS PROVIDED, UPON REVIEW ON BIS AND DOB NOW NEITHER WAS FOUND. STOP ALL WORK IMMEDIATELY UNDER PERMIT Q000630669PERMIT
Cited provision(s): 1C6 — 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Site Safety / Safeguarding — Summons 39557828L
CLASS - 2 · Issued August 8, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED: ACTIVE SITE UPON REQUEST FOR DOCUMENTATION. WORKERS LEAVE THE SITE , AND I WAS UNABLE TO CHECK SSP, SWS DRAWINGS AND SUPER LOGBOOK. STOP ALL WORK UNDER PERMIT Q00630669 /PROVIDE/MAINTAIN REQUIRED DOCU
Cited provision(s): 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Other Building / Code Compliance — Summons 39557827J
CLASS - 2 · Issued August 8, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BC3301.13.3 OBSERVED: ACTIVE SITE UPON INSPECTION WAS REQUIRED A CP, WORKERS SAY NO CP PRESENT . GC FAILURE TO DESIGNATE & HAVE A CP PRESENT ON SITE ON TIME OF AFTER HOURS VARIANCE WORK OR CONSTRUCTION OPERATIO
Cited provision(s): 2P7
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Site Safety / Safeguarding — Summons 39557831M
CLASS - 2 · Issued August 8, 2026; hearing October 20, 2026. · Hearing status: PENDING
DOB allegation in the source extract: BC3301.2 OBSERVED:ACTIVE SITE ,FEW WORKERS ON DUTIES NOT USSING HARD HAT & USSING SNEAKERS CONTRARY TO BUILDING CODE AND OSHA REGULATIONS. STOP ALL WORK UNDER PERMIT Q00630669 ENFORCE USE PPE ON SITE
Cited provision(s): 2P7
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Case-specific next step
For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.