Staten Island property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 21, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughStaten Island
BIN5010713
Block / Lot00376 / 0017
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039198184N (source ECB number 39198184N). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39198186R
ACTIVE
October 21, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 AT EXP 2 AND 3 OBSERVED LARGE PILES OF CONST DEBRIS. BEDRIS CONSTS IF COMBUSTIBLE WOOD, DRYWALL. CARDBOARD, VINYL SIDING SCRAP AND PALLETS. ALSO METAL STUD SCRAP, OLD TUB, APPLIANCES ETC., REPAIR AND/OR REPLACE 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39198184N
ACTIVE
October 21, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED IN BATHS NEW LAVATORY, TOILET AND SHOWER BODY ROUGHS WITH PVS PIPING AND RED BLUE PEX PIPING. ALSO NEW GAS LINES RAN AT LAUNDRY CLOSET AND KITCHEN. NEW PIPE IN LAUNDRY RUNS FROM FLOOR, NEW VALVE FOR LA 101 — 28-105.1 WORK WITHOUT A PERMIT
39198187Z
ACTIVE
October 21, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED YELLOW AND WHITE ROMEX WIRING INSTALLED IN WALLS, CEILING AND AT ELECTRIC PANEL. IN BATH ROMEX WIRING PROTRUDING FROM WALLS AND CEILING. NEW BLUE AND GREY PLASTIC WALL BOXES WITH NEW WIRE COILED INSIDE 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39198185P
ACTIVE
October 21, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED 2 DORMERS APPROX 12' WIDE BUILT AT EXP 2 AND 4. DORMERS ALTERED FROM A GABLE TO DUCTH HIP SHED DORMER. DORMERS ARE SHEATHED, ROOFED WITH WINDOWS. THEY ALSO ALLOW FULL HEIGHT STANDING ROOM. ALSO OBSERVE 101 — 28-105.1 WORK WITHOUT A PERMIT
39198188K
ACTIVE
October 21, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 AT ATTIC STAIRS THERE IS NO RAILING TO PREVENT FALLS. WORKERS ACTIVELY WORKING IN ATTIC AND WIRES, WOOD, DUCTS ETC PRESENT TRIP HAZARD. IMMEDIATE RISK FOR FALL INTO OPEN STAIRS, INJURY OR DEATH., REPAIR AND/REP 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; 2 Failure to Maintain summonses. The hearing date is October 21, 2026; the source issue date(s) are July 29, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Failure to Maintain — Summons 39198186R

CLASS - 2 · Issued July 29, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT EXP 2 AND 3 OBSERVED LARGE PILES OF CONST DEBRIS. BEDRIS CONSTS IF COMBUSTIBLE WOOD, DRYWALL. CARDBOARD, VINYL SIDING SCRAP AND PALLETS. ALSO METAL STUD SCRAP, OLD TUB, APPLIANCES ETC., REPAIR AND/OR REPLACE

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 39198184N

CLASS - 1 · Issued July 29, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED IN BATHS NEW LAVATORY, TOILET AND SHOWER BODY ROUGHS WITH PVS PIPING AND RED BLUE PEX PIPING. ALSO NEW GAS LINES RAN AT LAUNDRY CLOSET AND KITCHEN. NEW PIPE IN LAUNDRY RUNS FROM FLOOR, NEW VALVE FOR LA

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39198187Z

CLASS - 1 · Issued July 29, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED YELLOW AND WHITE ROMEX WIRING INSTALLED IN WALLS, CEILING AND AT ELECTRIC PANEL. IN BATH ROMEX WIRING PROTRUDING FROM WALLS AND CEILING. NEW BLUE AND GREY PLASTIC WALL BOXES WITH NEW WIRE COILED INSIDE

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39198185P

CLASS - 1 · Issued July 29, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED 2 DORMERS APPROX 12' WIDE BUILT AT EXP 2 AND 4. DORMERS ALTERED FROM A GABLE TO DUCTH HIP SHED DORMER. DORMERS ARE SHEATHED, ROOFED WITH WINDOWS. THEY ALSO ALLOW FULL HEIGHT STANDING ROOM. ALSO OBSERVE

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39198188K

CLASS - 1 · Issued July 29, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT ATTIC STAIRS THERE IS NO RAILING TO PREVENT FALLS. WORKERS ACTIVELY WORKING IN ATTIC AND WIRES, WOOD, DUCTS ETC PRESENT TRIP HAZARD. IMMEDIATE RISK FOR FALL INTO OPEN STAIRS, INJURY OR DEATH., REPAIR AND/REP

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.