What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Zoning / Parking / Use. The hearing date is October 21, 2026; the source issue date(s) are July 31, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Work Without a Permit — Summons 39198756J
CLASS - 1 · Issued July 31, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT EXP 4 A WOOD FRAMED STRUCT, APPROX 18L X 12W X 15H ON CONCRETE FOUNDATION, ACTIVELY BEING CONSTRUCTED. STRUCT IS SIDED, ROOFED W/2 SKYLIGHTS. NO FRONT ENTRY DOOR AND INT OPEN EXPOSED STUDS AND RAFTERS. ALSO
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 39198759P
CLASS - 1 · Issued July 31, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OBSERVED AT EXP 4 ELECTRICAL CONDUIT RUNNING FROM HOUSE AND ENTERING NEW WOOD FRAMED STRUCTURE. ALSO AN ELECTRICAL DISCONNECT FOR MINISPLIT AT SIDE OF NEW WOOD STRUCTURE. INSIDE STRUCTURE OBSERVED BX CABLES HAN
Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Zoning / Parking / Use — Summons 39198757L
CLASS - 2 · Issued July 31, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT EXP 4 OBSERVED A VINYL COMBUSTIBLE SHED LESS THAN THE REQUIRED 3' FROM PROPERTY LINE. SHED MEASURES 8" FROM PROP LINE AT EXP 4 AND 13" AT EXP 1. THE RCNY 101-14 REQUIRE MIN 3' FROM PROPERTY LINES.; 101-14, C
Cited provision(s): 284 — ZR-MISC MISCELLANEOUS VIOLATIONS OF THE ZONING RESOLUTION
How this type of condition is typically resolved
Zoning charges require comparing the observed use, parking arrangement or physical condition to the applicable zoning district, lawful occupancy and any prior approvals or variances. Correction can mean stopping the use, restoring required parking, or pursuing a lawful approval if available.
Hearing issues to verify
- Is the cited zoning district/use classification correct for this lot?
- Was the alleged use actually occurring on the issue date?
- Is there a prior BSA/CPC/DOB approval, variance or grandfathered condition relevant to the charge?
Evidence that may matter
- Zoning map and ZOLA/property records
- Certificate of Occupancy / approved plans
- Survey or parking layout
- Prior approvals, variances, permits and dated photographs
Work Without a Permit — Summons 39198758N
CLASS - 1 · Issued July 31, 2026; hearing October 21, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT EXP 4 OBSERVED WORKERS ACTIVELY INSTALLING COPPER WATER LINES FROM SIDE OF HOUSE TO A NEW FRAMED STRUCTURE IN YARD. COPPER RUNS ALONG SIDE OF HOUSE AND ENTERS STRUCTURE., OBTAIN PERMIT
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review