October 2026 NYC DOB / OATH Hearing — BIN 5088850

Staten Island property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 21, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughStaten Island
BIN5088850
Block / Lot08025 / 0045
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039197995M (source ECB number 39197995M). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39197994K
ACTIVE
October 21, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED EXISTING STRUCTURE WITHIN THE NEW BUILD IN PREOGRESS. EXISTING HAS ELECTRIC SUBPANEL, OUTLETS, OPEN BX WIRE, LIGHTING ETC. NO PERMITS ON FILE FOR ELECRTRICAL WORK AT TIME OF INSPECTION 12:15PM, OBTAIN 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39197992R
ACTIVE
October 21, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED AT REAR OF PROPERTY A 1 STORY WOOD FRAME STRUCTURE IN PROCESS OF BEING BUILT. APPROX SIZE 16W X 24D X 12H. EXTERIOR NEWLY FRAMED ALL 4 SIDES AND 80% SHEATHED. ROOF SHEATHED AND SHINGLED. STRUCTURE IS B 101 — 28-105.1 WORK WITHOUT A PERMIT
39197995M
ACTIVE
October 21, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED A SHED WITHIN THE NEW STRUCTURE WITH PLUMBING FOR A TOILET AND SINK. ALSO OPEN WASTE LINE AT WALL. IN YARD IS OPEN GAS LINE WHERE POOL HEATER WAS REMOVED. NO CAP ON LINE. NO PLUMBING PERMIT ON FILE., O 101 — 28-105.1 WORK WITHOUT A PERMIT
39199644J
ACTIVE
October 21, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 PARTIAL STOP WORK ORDER POSTED AT FRONT ENTRY DOOR ON 7/28/2026 UNDER COMPLAINT #5197959 WAS REMOVED. PSWO IS REPOSTED., COMPLY WITH CODE 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER
39197993Z
ACTIVE
October 21, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED COMBUSTILE CONST DEBRIS IN YARD CONSISTING OF WOOD, PLYWOOD, BLACK BAGS, OLD VINYL SIDING ETC. APPROX 10 YDS, REPAIR AND/OR REPLACE 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Stop Work Order; Failure to Maintain. The hearing date is October 21, 2026; the source issue date(s) are August 7, 2026, July 28, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39197994K

CLASS - 1 · Issued July 28, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED EXISTING STRUCTURE WITHIN THE NEW BUILD IN PREOGRESS. EXISTING HAS ELECTRIC SUBPANEL, OUTLETS, OPEN BX WIRE, LIGHTING ETC. NO PERMITS ON FILE FOR ELECRTRICAL WORK AT TIME OF INSPECTION 12:15PM, OBTAIN

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39197992R

CLASS - 1 · Issued July 28, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED AT REAR OF PROPERTY A 1 STORY WOOD FRAME STRUCTURE IN PROCESS OF BEING BUILT. APPROX SIZE 16W X 24D X 12H. EXTERIOR NEWLY FRAMED ALL 4 SIDES AND 80% SHEATHED. ROOF SHEATHED AND SHINGLED. STRUCTURE IS B

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39197995M

CLASS - 1 · Issued July 28, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED A SHED WITHIN THE NEW STRUCTURE WITH PLUMBING FOR A TOILET AND SINK. ALSO OPEN WASTE LINE AT WALL. IN YARD IS OPEN GAS LINE WHERE POOL HEATER WAS REMOVED. NO CAP ON LINE. NO PLUMBING PERMIT ON FILE., O

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Stop Work Order — Summons 39199644J

CLASS - 1 · Issued August 7, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: PARTIAL STOP WORK ORDER POSTED AT FRONT ENTRY DOOR ON 7/28/2026 UNDER COMPLAINT #5197959 WAS REMOVED. PSWO IS REPOSTED., COMPLY WITH CODE

Cited provision(s): 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER

How this type of condition is typically resolved

An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.

Hearing issues to verify

  • What exact work was covered by the Stop Work Order: all work or only part of the project?
  • Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
  • Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?

Evidence that may matter

  • Copy of the Stop Work Order and any rescission/modification notice
  • DOB permit records and inspector correspondence
  • Daily logs, photographs and contractor records showing when work stopped or resumed
  • Evidence identifying any limited corrective/safety work performed

Failure to Maintain — Summons 39197993Z

CLASS - 2 · Issued July 28, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED COMBUSTILE CONST DEBRIS IN YARD CONSISTING OF WOOD, PLYWOOD, BLACK BAGS, OLD VINYL SIDING ETC. APPROX 10 YDS, REPAIR AND/OR REPLACE

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.