We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Demolition

BoroughStaten Island
BIN5144418
Block / Lot03344 / 0039
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039556759M (source ECB number 39556759M). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39556759M
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF DEMO SIGNOFF INSPECTION REQUESTED BY CONTRACTOR NOTED ON DOB NOW THAT , NO NOTIFICATION WAS SUBMITTED TO THE DEPARTMENT OF BUILDINGS AS PER CODE REQUIREMENTS PRIOR TO START OF DEMOLITION . 116 — BC 3306.3,27-195 FAILURE TO PROVIDE REQUIRED NOTIFICATION PRIOR TO THE COMMENCEMENT OF
39556760J
ACTIVE
October 7, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 AT THE TIME OF INSPECTION FOR DEMO SIGN-OFF , I OBSERVED CONSTRUCTION FENCE AROUND PERIMETER OF SITE UPON MY REVIEW THRU DOB NOW SYSTEM FENCE PERMIT # S01047675-SI-FN WAS EXPIRED SINCE 06/21/2026 AND NO NEW PE 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Demolition; Construction Fence. The hearing date is October 7, 2026; the source issue date(s) are July 17, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Demolition — Summons 39556759M

CLASS - 1 · Issued July 17, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF DEMO SIGNOFF INSPECTION REQUESTED BY CONTRACTOR NOTED ON DOB NOW THAT , NO NOTIFICATION WAS SUBMITTED TO THE DEPARTMENT OF BUILDINGS AS PER CODE REQUIREMENTS PRIOR TO START OF DEMOLITION .

Cited provision(s): 116 — BC 3306.3,27-195 FAILURE TO PROVIDE REQUIRED NOTIFICATION PRIOR TO THE COMMENCEMENT OF

How this type of condition is typically resolved

Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.

Hearing issues to verify

  • Was a demolition permit or required notification in effect before work began?
  • Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
  • Do contractor and agency records show the required notice was timely?

Evidence that may matter

  • Demolition permit and DOB NOW filing history
  • Required notification confirmation / timestamp
  • Asbestos/environmental documents
  • Contractor logs, photographs and demolition sequence records

Construction Fence — Summons 39556760J

CLASS - 2 · Issued July 17, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION FOR DEMO SIGN-OFF , I OBSERVED CONSTRUCTION FENCE AROUND PERIMETER OF SITE UPON MY REVIEW THRU DOB NOW SYSTEM FENCE PERMIT # S01047675-SI-FN WAS EXPIRED SINCE 06/21/2026 AND NO NEW PE

Cited provision(s): 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

How this type of condition is typically resolved

Construction-fence charges generally require bringing the fence, gates, viewing panels, height and site protection into compliance with the approved construction-safety setup and maintaining it for the required duration.

Hearing issues to verify

  • Did the fence configuration on the inspection date match the approved/logistics plan?
  • Was the cited opening or defect temporary and promptly corrected?
  • Was a permit or construction-fence filing active where required?

Evidence that may matter

  • Approved construction-fence/site logistics documents
  • Dated photographs
  • Contractor logs and correction invoice
  • Permit/filing record

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.