What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Demolition; Construction Fence. The hearing date is October 7, 2026; the source issue date(s) are July 17, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Demolition — Summons 39556759M
CLASS - 1 · Issued July 17, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF DEMO SIGNOFF INSPECTION REQUESTED BY CONTRACTOR NOTED ON DOB NOW THAT , NO NOTIFICATION WAS SUBMITTED TO THE DEPARTMENT OF BUILDINGS AS PER CODE REQUIREMENTS PRIOR TO START OF DEMOLITION .
Cited provision(s): 116 — BC 3306.3,27-195 FAILURE TO PROVIDE REQUIRED NOTIFICATION PRIOR TO THE COMMENCEMENT OF
How this type of condition is typically resolved
Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.
Hearing issues to verify
- Was a demolition permit or required notification in effect before work began?
- Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
- Do contractor and agency records show the required notice was timely?
Evidence that may matter
- Demolition permit and DOB NOW filing history
- Required notification confirmation / timestamp
- Asbestos/environmental documents
- Contractor logs, photographs and demolition sequence records
Construction Fence — Summons 39556760J
CLASS - 2 · Issued July 17, 2026; hearing October 7, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION FOR DEMO SIGN-OFF , I OBSERVED CONSTRUCTION FENCE AROUND PERIMETER OF SITE UPON MY REVIEW THRU DOB NOW SYSTEM FENCE PERMIT # S01047675-SI-FN WAS EXPIRED SINCE 06/21/2026 AND NO NEW PE
Cited provision(s): 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
How this type of condition is typically resolved
Construction-fence charges generally require bringing the fence, gates, viewing panels, height and site protection into compliance with the approved construction-safety setup and maintaining it for the required duration.
Hearing issues to verify
- Did the fence configuration on the inspection date match the approved/logistics plan?
- Was the cited opening or defect temporary and promptly corrected?
- Was a permit or construction-fence filing active where required?
Evidence that may matter
- Approved construction-fence/site logistics documents
- Dated photographs
- Contractor logs and correction invoice
- Permit/filing record
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.